总概算

zǒnɡ ɡài suàn
  • general estimate
总概算总概算
  1. 国外贷款港口建设项目的总概算编制

    General Cost Estimation Compiling Method for Foreign-Financed Port Construction projects

  2. 就利用国外贷款港口建设项目总概算的编制内容与方法进行探讨。

    This paper inquires into the contents and method for compiling the general cost estimation for foreign - financed port construction projects .

  3. 其中消防站和紧急救生站为外委工程,待外委单位完成初步设计概算投资后汇入总概算。

    The fire fighting station and emergency life saving station are outsourcing projects , and are to be accounted into the general budget estimate after the outsourcer completes preliminary design estimate investment .

  4. 施工组织设计是水利水电工程设计文件的重要组成部分,是编制工程投资估算、总概算和招标文件的重要依据;

    Construction design is an important component of documents on water conservancy and hydropower project design , and is also an important basis for formulating investment estimate , general budget estimate and bid invitation documents of a project .

  5. 限额设计就是按照批准的可行性研究报告及投资估算控制初步设计,按照总概算控制技术设计和施工图设计,严格控制不合理变更,以保证总投资不被突破。

    Quota design is aim to control the preliminary design according to the approved feasible analysis report and rough estimate of fund inputs . Through controlling technical design and working drawing design , serious avoiding unreasonable change , to ensure the total fund inputs do not be exceeded .