导墙

  • 【电力】guide wall
导墙导墙
  1. 这说明存在可适当缩短左导墙长度的可能性,经试验研究,缩短左导墙长度52m。

    It demonstrates that the possibility to suitably shorten the length of left training wall exists . It is finally shortened by 52 m after test and study .

  2. 三峡工程左导墙碾压混凝土38万m3,在满足设计要求的基础上对配合比进行优化调整,并经现场碾压试验,最终确定该部位碾压混凝土的施工配合比。

    The left guide wall at the Three Gorges project has a RCC volume of 380 000 m 3 . While meeting the design requirements , the construction mixes for RCC at the left guide were fixed finally by optimum adjustment of mixes and field compaction tests .

  3. 导墙结构振动属流体和固体耦联振动。

    Vibration of guide wall structures belongs to vibration of fluid-structure interaction .

  4. 三峡大坝左导墙长度优化设计

    Optimization of the length of left training wall at TGP

  5. 小浪底工程进水口引渠导墙设计

    Guide Wall Design of Water Approach Channel at Intake of Xiaolangdi Project

  6. 三峡溢流坝左导墙流激振动有限元计算分析

    FEM analysis on flow-induced vibration of TGP left traning wall

  7. 大坝防渗墙施工导墙控制爆破拆除

    Demolition of Concrete Cut - off Wall of Dam by Controlled Blasting

  8. 混凝土预制导墙在地下防渗墙(连续墙)施工中的应用

    Application of Prefabricated Concrete Guide Wall in Construction of Underground Anti-seepage Wall

  9. 导墙结构的流激振动研究

    Study on flow induced vibration of spillway guide wall

  10. 某地铁车站地下连续墙特殊地段导墙的施工

    The underground continuous wall special sector guide wall construction of some subway station

  11. 导墙对地下墙泥浆槽壁的稳定作用分析

    Analysis of Stability Actions of Guide Wall on Slurry Trench Sides of Diaphragm Wall

  12. 三峡工程左侧导墙碾压混凝土施工

    Construction of Rolled Concrete of the Left Guide Wall of the Three Gorges Project

  13. 通过实验获得了某消力池导墙的脉动壁压信号,并将正交分解方法引入到脉动壁压的研究中。

    The method of proper orthogonal decomposition was used in the investigation of wall-pressure fluctuation .

  14. 青铜峡水电站河西导墙变位计监测数据计算方法

    Calculating Method for Monitoring Data from Hexi Guide Wall Displacement Meters in Qingtongxia Hydropower Station

  15. 消力池底板及导墙脉动压力特性试验研究

    Experimental research on fluctuating pressure characteristics of bottom plate of stilling basin and training wall

  16. 黑河水库右岸溢洪洞左导墙修改试验总结

    Mending Left Guide Wall of Spillway Hole in the Right Bank of the Heihe River Reservoir

  17. 将正交分解与低阶近似方法引入到消力池导墙脉动壁压的研究中。

    Moreover , the method of proper orthogonal decomposition and low dimensional approximation was used to the research .

  18. 消力池导墙脉动壁压的正交分解与低阶近似

    Proper orthogonal decomposition and low dimensional approximation of the wall-pressure fluctuation acting on the apron of the stilling pond

  19. 左导墙位于泄洪坝段与左厂房坝段之间的导墙坝段下游。

    The left training wall of TGP is situated downstream of the transition dam section between spillway and left intake dam .

  20. 通过五组防护试验比较得知,导墙头部铅丝石笼平面防护后,阻止了水流对导墙的淘刷保持了导墙的稳定性。

    The experimental results show that the gabion of stone prohibits current from scouring the guiding wall and holds the stabilization for guiding wall .

  21. 在此基础上,以泄流荷载为激励源,利用动力响应对导墙结构的工作模态参数进行了动态识别;

    Based on this prototype dynamic test , the operational modal parameter of the guide wall is identified under flood discharge excitation during flood season .

  22. 对于导墙振动问题,不但要研究结构在水动力荷载作用下的耦联振动,还包括结构服役阶段结构的安全问题。

    For vibration of guide wall , interaction vibration of structures with fluid dynamical loads needs to be studied ; safety of structures is also included .

  23. 结合万安导墙模型动态特性试验,研究了激振器的安装和模态测试方法。

    Through the dynamic property model test for Wan'an Project 's guide wall , the installation of exciter and test method for oscillating mode are studied .

  24. 本文主要介绍应用高喷技术对安居水电站溢流坝、堰坝导墙、溢流堰天窗沙卵石基础处理的方法和体会。

    This paper presents sand and cobble foundation treatment of overflow dam , guide wall and overflow weir by " high pressure jet grouting " at An in Hydropower Station .

  25. 从技术和经济两个角度,对连续锯槽成墙工艺技术与高压喷射注浆法构筑地下防渗墙技术作了介绍和分析。混凝土预制导墙在地下防渗墙(连续墙)施工中的应用

    Abstract : In this paper , the technique of continuous trench for cutting pile wall and the technology of high Application of Prefabricated Concrete Guide Wall in Construction of Underground Anti-seepage Wall

  26. 水电站厂坝间溢洪道泄槽的导墙结构长期处于水流交变荷载作用,容易造成结构损伤。

    The guide wall of spillway in hydro project is subject to long-term complicated loads , such as alternative water pressure and wind pressure , which may lead to the damage of structures .

  27. 为了优化施工,进而为三峡工程三期临时挡水围堰的碾压混凝土施工模索经验,左导墙结构按碾压混凝土设计。

    In order to optimize construction and obtain experience for the RCC construction of the third phase temporary cofferdam at the Three Gorges project , the left guide wall was designed to be built with RCC .

  28. 万安水电站二期主体工程溢流坝6~15坝段、左岸非溢流坝5坝段和左导墙部分拟采用碾压混凝土筑坝技术。

    Roller compacted concrete ( RCC ) will be used in section No.6-No.15 of the spillway dam , section No.5 of the non-overflow dam near the left side bank and the left guide wall of Wan'an Project .

  29. 该文介绍了采用混凝土预制导墙施工地下防渗墙(连续墙),导墙预制可与地质复勘、基槽开挖等同时进行,加快施工速度;

    Engineers adopt prefabricated concrete guide wall to construct underground anti-seepage wall . The prefabrication of guild wall , geologic investigation , and pit excavation are carried through at the same time , which shorten the construction time .

  30. 结合具体的工程实践,详细阐述了地下连续墙的主要施工方法,从导墙、成槽、锁头管放置、钢筋笼制作和吊放等方面作了阐述,从而使工程符合设计及规范要求。

    Combined with practical work the major construction method of underground continuous wall is introduced in detail from guide-wall , fabrication and lifting of steel reinforcement cage and other aspects in order to ensure design and code requirements .