引黄入晋

引黄入晋引黄入晋
  1. 引黄入晋联结段7号隧洞TBM卡机事故原因数值模拟分析

    Numerical simulation of cause of tunnel boring machine jamming in section of connection works No.7 tunnel of Yellow River diversion project in China

  2. 引黄入晋工程预制混凝土管片生产与安装

    Fabrication and installation of precast segments for Shanxi Yellow River Diversion Project

  3. 综合物探在引黄入晋工程中的应用效果水利水电工程物探展望

    Application effect of comprehensive geophysical prospecting in the project of leading Huanghe River into Shanxi Province

  4. 引黄入晋输水长隧洞若干工程地质问题

    Some geological problems of long diversion tunnel for deriving water from Yellow River to Shanxi Province

  5. 引黄入晋工程南干线一级泵站进水系统优化研究

    Optimization study for water incoming system of SM first stage Station of the Yellow River Diversion Project

  6. 引黄入晋工程变速泵控制前池水位的调节模型

    Mathematical Model for Water Stage Regulation with Variable-speed Pump in Diversion Project from Yellow River into Shanxi Province

  7. 引黄入晋工程的桩号系统设计与应用

    The Design and Application of Stake Number System for the Project of Diverting Water from the Yellow River to Shanxi Province

  8. 本文对万家寨引黄入晋工程南干一级泵站厂房机墩柱结构进行动力计算研究。

    This paper studies the calculation on the dynamic of the machine pier column structure of the first pumping plant house , the YRDP .

  9. 引黄入晋工程南干线7隧洞有33km长的碎屑岩洞段,其间的部分泥质岩夹层具有膨胀性。

    There is a 33 km 's length of classtic rock tunnel in Tunnel 7 of south trunk line . Part of argillaceous seams along the length is of swelling .

  10. 按照引黄入晋输水工程对仿真的基本需求,提出引黄入晋输水工程全系统运行仿真系统总体方案。

    According to the basic requirement of the water conservancy project of drawing water from Yellow River to Shanxi , the paper puts forward the plan of the simulation system for the project .

  11. 对于象引黄入晋工程这样的由多个混凝土建筑物紧密且硬性衔接而成的、高精度、超长线路工程来说,桩号系统设计是一个十分重要且具有实际应用意义的问题。

    It is very important and practical to design stake number system for closely and hardly linking up many concrete structures , high precision , extremely long line project like Yellow River diversion project in Shanxi Province .

  12. 山西省引黄入晋工程是目前国内在建的投资最大的调水工程,合理的水价政策及管理体制对引黄工程至关重要。

    Water Diversion from the Yellow River to Shanxi is the biggest water diversion project under construction in China in terms of investment . To have reasonable water pricing policy and management system is of great importance for the Project .

  13. 本文阐述了山西省万家寨引黄入晋工程的一、二级泵站工程碎石挤密振冲桩复合地基的设计与施工,并提出了桩检验的方法。

    The article expounds the design and construction of broken stones vibration pile of the first and second grade pump station 's project of leading Huanghe River 's water into Shanxi province . And it advances the method of test pile .

  14. 根据引黄入晋工程连接段隧洞施工中围岩变形情况,讨论了隧洞收敛观测断面的布置原则、现场观测方法以及观测数据的温度修正。

    From the deformation status of surrounding rock during the tunnel construction in " the Yellow River Diversion Project ", the layout principle of observation sections , the observation method of convergence , and the modified formula of the measured data were discussed .

  15. 跟踪研究国家重点工程(引黄入晋)中的重大科技难题。解决了远距离、长隧洞、全封闭引水工程的洞内水位、水情检测与控制问题。

    We followed and studied the great scientific and technological difficult problem of national key project ( Yellow River Diversion Project to Shanxi province ) and solved the water-level measurment and control in the long tunnel which characters in long distance and closed circumstance .

  16. 在引黄入晋工程部分管段水工模型试验研究基础上,通过数值计算得到了泵组的瞬变工况,其特性与初始流量和调节幅度有关。

    On the basis of hydraulic model experiments of part pipeline in divert water engineering from the Yellow River to the Shanxi Province , by means of numerical calculation , transient condition of pumps were obtained . Transient condition characters relate to initial flowrate and regulate rangeability .