涉外项目

  • foreign-related project
涉外项目涉外项目
  1. 港口工程涉外项目工程造价探讨

    Probe into the Engineering Cost of Foreign-related Port Projects

  2. 掌握世界前沿技术,创新超前服务理念,做好涉外项目前期工作

    Introducing Advanced Technology , Upgrading Service Concept and do a Better Job for Front End Work of Overseas Projects

  3. 浅谈涉外EPC项目的技术管理&孟加拉吉大港新锚地集装箱码头项目

    Discussion on Technical Management of Overseas EPC Projects & NCT Container Terminal Project in Chittagong , Bangladesh

  4. 涉外建设项目安保、电视系统设计规范

    Design code of security TV system for foreign associated construction projects

  5. 涉外工业项目风险分析方法

    The risk analysis approach to industry project concerning foreign nations

  6. 本文对于涉外工业项目的风险分析问题进行了研究。

    This paper studies risk analysis of industry project concerning foreign nations .

  7. 涉外公路项目索赔理论与方法

    Theory and Method of Claims in International Highway Projects

  8. 涉外化工项目设计风险谈

    Discussion of the Risk of International Chemical Design Project

  9. 涉外工程项目索赔的管理与技巧

    Management and Know-how of Claim of Foreign Project Related

  10. 涉外投资项目也不例外。

    Foreign investment projects are no exception .

  11. 随着涉外工程项目的增多,增强勘察设计企业设计产品的知识产权保护意识已经越来越重要。

    The problem becomes more important that intensify knowledge property pro-jection and ways of project plan along with more project abroad .

  12. 水利水电涉外工程项目保证/担保形式及保函类型探讨

    On the Independence of Suretyship Discussion on Guarantee Form and the Type of Guarantee Agreement in International Project of Water Conservancy and Hydroelectric Power

  13. 针对建筑企业专家评估出的结果,详细的规划涉外工程项目进行过程中的风险,并分别采取不同的风险处理方法来处理不同类别的风险。

    For enterprise experts ' different assessment results , detailed planning concerning foreign affairs in the process of engineering project risk , and adopt different processing method to deal with different categories of risk .

  14. 风险管理最基础的工作是对风险进行识别,风险识别的方法有很多种,具体到涉外工程项目,本文提供了七种方法对涉外工程项目运作时可能遇到的风险进行识别。

    The basis of a risk management work is carried out for risk identification , risk identification method has a lot of kinds , specific to foreign engineering project , this paper provides seven ways for foreign engineering project operation risk identification .

  15. 根据不同的项目特点,企业在涉外工程项目的风险管理过程中选择采取不同的风险管理模式,采取各种形式的组织结构,以保证企业能够更好地驾驭风险。

    Depending on the characteristics of the project , in the International Project of the risk management process , taking a different risk management models and a variety of forms of organizational structure to ensure that company can better avoid risks , reduce losses .

  16. 文章根据水泵的汽蚀特性和ISO及GB试验标准的要求,结合数次涉外灌溉工程项目所用水泵的真机汽蚀试验的经验,提出了一种大中型水泵的真机汽蚀试验方法。

    A suitable cavitation testing method for the prototype pump with high capacity is suggested based on the studies of the cavitation , testing standards and the experience of some prototype pump test .

  17. 项目主管制在技术改造项目中的应用涉外造纸厂改造项目执行管理的思考

    The Application of Project Manager Method Applied in Technological Retrofit Project