交接试验

  • 网络Handover test;SAT
交接试验交接试验
  1. 一起GIS交接试验过程中的放电情况分析

    Analysis of Discharge in GIS During Commission Test

  2. 目前GIS的型式试验、出厂试验和现场交接试验都要求进行局部放电试验。

    At present GIS requires to do the PD test in the type test 、 factory test and field test .

  3. XLPE电力电缆施工交接试验结果分析

    Analysis on the result of the acceptance test of XLPE electric cable during the process of installing

  4. 该装置可用于对电容型试品(如电力电缆、发电机、套管和电容器等)进行耐压试验,特别是现场安装后的SF6电气设备的交接试验。

    The system is designed for high voltage test of capacitive equipments such as power cable , generators , bushings and capacitors , especially for field commissioning test of SF_6 gas insulated equipments .

  5. EST-C1变电站电气试验车适用于电力变电站及电气化铁路牵引变电所的电力设备的工程交接试验及预防性试验。

    The Substation Electrical Testing Coach ( EST-C1 ) is used for high voltage electrical equipment in substation or feeder station 's preventive test and project 's handing over test .

  6. 电缆的试验及运行记录表明,其交接试验中直流耐压试验不是十分有效的方法;

    It is shown that DC voltage withstand test is not very effective .

  7. 关于在混合线路中电缆交接试验的探索

    Discussion on the Commission Test of Cable Connected with Overhead-line in the Transmission Lines

  8. 提出了交接试验中强励试验时间可为0.2-0.3s;

    The duration , 0.2-0.3 s , for the ceiling voltage during hand over test is put forward ;

  9. 详细介绍了微机型继电保护装置的研制试验、现场安装试验及交接试验的性质、意义;

    The nature and importance of testing and development , fleld installation and hand-over test for microcomputer relay protective device are introduced in detail .

  10. 为了确保电力电缆安全运行,电力电缆在运行前和运行中要进行交接试验、预防性试验和在线监测。

    In order to ensure the safe operation , power cable in operation and before the operation should carry out handover testing , preventive testing and on-line monitoring .

  11. 指出交联聚乙烯绝缘电缆的交接试验沿用传统的直流耐压试验方法存在不足,较合适的方法是进行2U0,5min的调频串联谐振试验。

    It is indicated that the conventional method of DC withstand voltage test is defective for the acceptance test of XLPE cables , and the frequency-modulated series resonance test of 2U_0 , 5 min is more appropriate for the said purpose .

  12. 建议有关标准应完善对高压开关设备的高电压测试手段和要求,在出厂试验及现场交接试验时,须对高压设备进行运行电压的噪声测试。

    This paper suggests that relevant standards should bring the HV measuring means and requirements of HV switchgears to perfection . When doing routine tests and take-over tests on site it is necessary to test HV switchgears for noises of voltage during run .

  13. 同时将样机移交至工厂进行了样机的安装和实验,并完成了样机的交接工作,试验结果表明本论文设计的测量系统能够很好的实现真空度在线测量的目标。

    I have also handed the prototype to the factory and finished the installation and experimental work of the prototype . Results can be verified that the system is capable of vacuum degree online measurement .

  14. XLPE电缆交接和预防性试验方法的发展现状

    Present Situation of XLPE Cable Handover and Preventive Test Method

  15. 中压交联电缆的交接、预防性试验

    Test after Installation and Preventive Tests of MV XLPE Cable

  16. 浅析交联电力电缆的交接和预防性试验

    On acceptance and preventive tests of XLPE cables