首次装料

  • 网络First loading;first fuel loading
首次装料首次装料
  1. 10MW高温气冷堆首次装料的包覆燃料颗粒研制

    Research and Development on the First-loading Coated Fuel Particles for the 10 MW High Temperature Gas-cooled Reactor

  2. 首次装料的核安全和核监测

    Nuclear Safety and Nuclear Monitoring of the Initial Core Loading

  3. 两台机组的首次装料设计和首次换料设计由法马通承担。第3循环大亚湾核电站与国内换料设计单位一起致力于换料设计自主化,井开始与法马通背靠背的换料堆芯设计。

    The two initial core design and first reload design were done by Framatome .

  4. 对田湾核电站首次装料前场内应急综合演习主要经验的讨论

    Discussion on the main experience in TNPS on-site comprehensive emergency exercise before first fuel loading

  5. 首次装料试验结果表明,仔细筹划、充分准备是装料试验成功的基础,试验结果满足验收准则。

    The initial core loading test indicated that overall planning and careful preparing before loading test is basic to success this test . Test results agreed with acceptance criteria .

  6. 蒙特卡罗方法用于HTR-10首次临界燃料装料预估的校算

    Application of Monte Carlo Method for Verification Calculation in Fuel Loading Prediction for First Criticality of HTR-10