缺陷责任期
- 网络defect liability period;the defects liability period
-
缺陷责任期与在与被保险工程有关的各种合同中定义的一致。
Defects Liability Period shall mean the period ( s ) as defined in the various contracts in relation to the Project Insured .
-
缺陷极限公差是缺陷责任期允许的最大偏差。
The defect limits tolerances are the maximum deviations which will be permitted during the defects liability period .
-
论述了声屏障工程缺陷责任期的监理工作内容;
Fifthly , states the supervision work content during defective obligation phase .
-
施工准备期和交工及缺陷责任期与一般工程监理类似,本论文重点提出了这两个阶段的环保审查要点。
Preparatory phase and handing over and defective liability phase are similar to general project supervision , the thesis has brought forward environmental protection examination outlines .
-
水土保持工程监理根据施工顺序可分为施工准备期监理、施工期监理和交工及缺陷责任期监理三个阶段,根据内容可分为质量监理、费用监理和进度监理。
Supervision of soil and water conservation project can be divided into three phases : supervision of construction prepared phase , supervision of construction phase and supervision of defective obligation phase in accordance with construction order .
-
通过对丹本高速公路部分路段通车使用后防护、排水工程破坏现象的调查、分析及维修处理,提出在设计、施工及缺陷责任期阶段控制防护、排水工程破损破坏的方法和途径。
Through the medium of investigation , analysis and maintenance of destruction of protection-drainage projects at part road section of Dan-Ben Freeway after opening to traffic , the paper puts forward method and way to control demolition of protection-drainage projects at stages of design , construction and resposibility for defects .