人工井底
- 网络Artificial bottom hole;PBTD
人工井底
-
1988年用普通陶粒压裂酸化后,砂面高于人工井底45.35m;
Produced sand was compiled 45.35 m high above the bottom after a fracturing acidizing job with standard haydite finished in 1988 ;
-
分注管柱实施锚定或支撑到人工井底,克服了管柱因注水压力不平稳等原因造成的管柱蠕动现象;
The anchoring or set to the artificial bottom hole of the separate injection pipe string has solved the creep of the pipe string resulted from the unstable water injection pressure .