  1. 其次对目前计划停电管理工作中存在的问题进行了分析,根据实际工作经验提出了在计划停电管理工作中应遵循的主要原则以及确保这些主要原则实施的各种管理措施;

    Secondly , the existent problems in the scheduled outage were analyzed , and according to the actual working experiences , the major principles in the scheduled outage management as well as the management measures for ensuring these major principles for implementing were put forward .

  2. 做好中压电网计划停电管理工作提高供电可靠性

    Make for Scheduled Outage Management of Medium Voltage Power Network to Improve Power Supply Reliability

  3. 计划停电对中压用户供电可靠性的影响

    Influence of Planned Interruption on Power Supply for Middle Voltage Consumer

  4. 强化掘进工作面局扇供电,避免无计划停电造成瓦斯超限

    Strengthened Tunneling Working Surface Auxiliary Fan Power Supply , Avoids Non-plan Power Cut Ultra Creating Gas to Limit Gas Station

  5. 对于提高采区供电系统保护动作的选择性和可靠性,改善采区供电质量,减少设备故障率,进而减少因故障频发而造成的无计划停电现象,具有重要意义。

    It has vital significance on improving the Selective and reliability of protection system , power supply quality and reducing equipment failure in mining area .

  6. 通过主问题和子问题的反复优化迭代,最终获得供电企业售电损失最小的检修计划以及停电负荷、开关操作次数和系统网损最小的负荷转移方案。

    By the solving reiteration of main and sub-problem , it finally gets an optimal maintenance schedule with the least electricity sell loss and an optimal load transfer plan with the least load loss , switch operations and transmission loss .

  7. 发电容量的退出是为了计划维修或计划停电,或者偶然由于非计划或强迫停运。

    Generating capacity is taken out of service for scheduled maintenance or planned outage and is occasionally lost on an unplanned or forced outage .

  8. 采用本文提出的优化方法可初步考虑设备状态实施检修,使编制出的计划既减少了停电损失,又能提高设备运行的安全性,提高系统的可靠性,提高了企业的社会效益和经济效益。

    The proposed optimization model makes the maintenance take the state of equipments into consideration , which can not only minimize the outage cost , but can improve the operation safety of equipments also , so as to improve system reliability and social and economic benefits of power supply company .