生产时间

shēnɡ chǎn shí jiān
  • productive time
生产时间生产时间
  1. 其中地层压力随生产时间变化的动态模型,将改变传统的气井静态配产方法。

    One of these kinetic models is the geologic strata pressure with productive time variety , which will change the traditional static optimization allocation .

  2. 本文讨论了原料为易腐的生产贮存控制中的需求为随机变量的问题,给出了最优的生产点、批量生产时间、(S,s)策略中最优的S和s所应该满足的条件。

    This paper deal with several productive and inventory problem with deteriorating ram material where the rate of demand is a random veriable , and determined the optimality condition for productive point , productive time , S and s of ( S , s ) policies .

  3. 在外边界封闭的情况下,不考虑CD和S的无量纲平均地层压力,与无量纲生产时间成正比;

    In the closed case , the relation between dimensionless average pressure and dimensionless time is linear if CD and S are neglected .

  4. 双主轴CNC车床可缩短生产时间

    Dual-spindle CNC lathes can Cut Production Time

  5. 用随机算法PSO算法对该模型进行求解,结果表明该模型可以节省清洗设备的辅助生产时间,相应地增加了生产时间,有利于提高工厂的实际效益。

    The results show the assistant time is decreased hugely , that means the production time is increased and the benefit of the factory is raised .

  6. TPM由使或消灭使用驾驶废物在制造过程外面生产时间降低丢失到机器失败。

    TPM is used to drive waste out of the manufacturing process by reducing or eliminating production time lost to machine failures .

  7. 重组蛋白疫苗通常需要6到12周的生产时间。在发生流感大爆发的情况下,ProteinSciences只需要3到6个月的时间,就能向全美提供5000万支流感疫苗。

    The recombinant vaccine typically takes between six to 12 weeks to manufacture , and in the case of a pandemic Protein Sciences is ready to provide 50 million doses to the U.S. government in as quickly as three to six months .

  8. 鉴于市场日益紧迫的需求,芯片的设计周期愈发变得短暂,因此,SoC芯片中大量地采用了预先设计好的、完整的IP(Intellectualproperty)模块来减少生产时间。

    On the other hand , because the market increase urgently for the demand of the chip design cycle , so that the model of SoC chip massively adopted pre-designed and integrated IP ( intellectual property ) module to reduce production time .

  9. 在分析影响PCB板组装生产时间的主要因素之后,论文针对此类生产环境建立了以最小化贴片机调整时间为优化目标的数学规划模型。

    Making clear the main factor on PCB assembly time in low-volume and high-mix production , the paper builds for the problem a mathematical programming model with minimizing machine setup time as the optimization goal .

  10. 沙钢润忠公司EAF-LF-CC流程的生产时间分析

    Analysis to the production time during EAF-LF-CC procedure

  11. 只有同质才能比较,因此把偏差e(t)细化成生产时间偏差和生产成本偏差等,并给出了计算方法。

    It can be compared one variance with the other only they are homogeneous , so the deviation e ( t ) was subdivided into the deviation of production time and the deviation of production cost etc. The calculation methods of the deviation e ( t ) was represented .

  12. 从物质平衡方程入手,给出稳产时间和地层压力的变化关系,进而获得地层流入动态曲线(IPR曲线)随生产时间的变化规律。

    A relationship between gas reservoir pressure and stable production time can be obtained by means of material balance technique . According this relationship , we can predict the change of inflow performance relationship curve with time .

  13. 优化结果为:生产时间60d,注汽干度70%,周期注入量2210t,注汽压力4.0MPa,焖井时间3d,注汽速度220t/d。

    The optimization parameters are production time 60d , steam dryness fraction 70 % , cyclic steam injection volume 2 210 t , and steam injection pressure 4.0 MPa , stew time 3d , and steam injection velocity 220 t / d.

  14. 鉴于我国电力生产时间序列数据的完备性,在对该时间序列进行平稳性检验的基础上,比较分析建立了我国电力生产量的ARIMA模型,并运用所建立模型进行了预测。

    In view of the fact that the electric power productive data is completeness , the paper examines the stability of the data and compares some ARIMA models about China 's electric power production , then conducts the forecast research using the better model .

  15. 巴雷特从日本公司学到了有关的生产时间经验,随后他将这些经验应用到芯片的制作和生产中。

    He applied what he learned at Intel 's chip-fabrication plants .

  16. 单井的测试生产时间一般为28~35d。

    Single well test-production period is usually 28 ~ 35 d.

  17. 改进方案既节约了维修成本,又赢得了生产时间。

    The projects economized maintaining cost and saved production time .

  18. 同类纸张不同生产时间的检验

    Inspection of Production Date for a Same Kind of Paper

  19. 随生产时间增长,表皮效应的影响逐渐消失。

    As production time increases , the impact of skin effect becomes disappearing .

  20. 可确保稳定的生产时间和质量。

    To ensure stability of production time and quality .

  21. 气田井网密度越大、生产时间越长、剩余气越少。

    More well density and production time , less distribution of remaining gas .

  22. 现代化技术缩短织厂生产时间

    Modern developments shorten throughput time in the weaving mill

  23. 服装企业最重要的是生产时间的问题。

    Clothing enterprises produce the most important thing is a matter of time .

  24. 请告知样品什么时间可以提供?及大货生产时间?

    Please advise your sample and product lead time .

  25. 基于合并原则的柔性装配线平均生产时间的确定方法

    Consolidation Principle-Based Method of Determining Average Production Time for the Flexible Assemble Production Line

  26. 停机时间:机器在维修或进行作业准备时的非生产时间。

    Down-time : Non-productive time when a machine is being maintained or made ready .

  27. 随着生产时间的推移,该现象越来越明显。

    This phenomenon is more and more obvious .

  28. 估计生产时间、相关成本等信息提供给管理层参考决断。

    Estimates production times , and related costs to provide information for management decisions .

  29. 同时,利用分级球磨技术还可以缩短生产时间,提高生产效率。

    Grading ball milling can also shorten production time and raise efficiency of production .

  30. 低渗凝析气井有效生产时间确定方法凝析气试井技术现状

    A method to determine the effective production time of low permeability condensate gas well