打浦路

打浦路打浦路
  1. 计算了上海市打浦路隧道的沉降,与现场观测结果较为一致。

    The calculated result is in good agreement with in situ observation .

  2. 通过现场实测及采用有限元理论评估分析后,认为目前打浦路隧道圆形段车道板结构不仅能满足原设计的承载要求,而且也能符合汽-20级的承载标准。

    After site testing and estimative analyzing with finite element theory , the structure of the traffic lane slab in the circular section of da-pu road tunnel not only meets the bearing requirement of the original design , but also conforms to the bearing standard of Automobile-20 at present .