进度管理计划

  • 网络Schedule Management Plan
进度管理计划进度管理计划
  1. 以进度管理计划促进项目进度管理,用进度管理工具保证计划的执行,提高进度管理效率。

    Schedule management plan project progress management , schedule management tools to ensure the implementation of the plan to improve schedule management efficiency .

  2. 以及运用现代项目进度管理计划编制应遵循的原则,针对胎儿监护仪项目的特点,提出了在胎儿监护仪项目进度管理计划编制中宜采用的方法和手段。

    As well as the use of modern project schedule management plan should follow the principle of the preparation for fetal monitors the characteristics of the project proposed in the fetal monitor project schedule management plan in preparation of suitable ways and means .

  3. 在进度管理计划制定中尽量避免因为进度活动流程和任务计划制定的不科学、不缜密、不合理而影响到项目进度管理任务的实施。

    Try to avoid because of the progress in the progress management plan activity process and task planning is not scientific , not thoughtful , reasonable and not affect the project schedule management plan implementation .

  4. 浅谈施工项目进度管理与计划调整

    Talking about the Progress Control and Plan Regulation of the Construction Project

  5. 本论文中所提供的这套造价与进度集成管理计划的应用方法,其在实践中的利用推广将有利于进一步提高建设项目的管理水平和经济效益。

    The utilization of these methods can be in favor of the project management to improve its managing level and profit .

  6. 在组织与计划管理保障、项目资源保障措施、劳力安排保障措施、进度应急管理计划等方面分析。

    In the organization and project management , project resource security measures , labor security arrangements Measures , the analysis of the emergency management plan schedule , etc.

  7. 作为建设项目集成管理全部内容当中的核心部分,造价与进度集成管理计划的研究与应用尚处于探索阶段。

    The cost & time integrated management program , as the core of integrated project management , its research and utilization is under the station of exploring yet .

  8. 建设工程总承包进度管理与进度计划编制探讨

    Establishment of Progress Administration and Progress Schedule of EPC

  9. 完整的进度管理包括进度计划和进度控制,前者是后者的基础,后者是前者的保障。进度计划和进度控制的有机结合才能够确保项目建设的如期完成。

    A complete construction project management should both include schedule and control . The former is the basis of the latter , and the latter is the security of the former .

  10. 进度管理的网络计划技术方法不仅能完整揭示一个项目所包含的全部工作以及他们之间的关系,而且还能应用最优化技术合理安排各项工作。

    The network planning methods in the time fields of project management can articulate not only all the activities and relations of a project completely , but the critical activities through mathematical methods and optimization techniques .

  11. 项目进度管理模块主要包括计划管理、体制管理和实际绩效管理。

    The progress of the project management module includes organization management , plan management and performance management .

  12. 通过举例,说明了在项目进度管理中引入网络计划技术进行网络分析具有系统性、可控性和动态性的特点,可实现进度和资源的优化控制。

    Using network planning technique for network analysis in project schedule management has the systematical , controllable and dynamic features , and can implement optimized controls of schedule and resources .

  13. 基于IT平台,从进度计划管理、进度计划执行与控制、进度监测预警与调整三个方面分析了南京三桥项目进度管理业务流程重组方案。

    Based on the IT platform , the business process re-engineering scheme of schedule management was put forward and discussed from three aspects including schedule planning management , schedule plan executing and controlling and schedule monitoring and adjusting .

  14. 本文以A省移动垃圾短信治理项目作为案例,介绍了在通信工程项目中应用项目进度管理理论解决进度计划、优化和控制的方法并分析了在此过程中需要关注的重点。

    With the case of spam messages project , this article introduces the application of progress management theory in communication engineering project in to solve the problems in progress management , optimization and control . This article also discusses the focus in above process .

  15. 通过应用进度控制的项目进度计划、绩效报告、变更请求和进度管理计划这几方面的控制基准为项目进度计划控制提供依据。

    Progress through the application of the control of the project schedule , performance reports , change requests , and schedule management plan to control these aspects of the project schedule baseline provide the basis for control .