接引

jiē yǐn
  • Connection;guide;lead the way
接引接引
接引 [jiē yǐn]
  • (1) [guide]∶引进;接待

  • 接引后学

  • (2) [meet and guide]∶佛教指佛引导信佛的人到西天去

  • 接引众生

  1. 不经置换在焦炉煤气管道上接引的可能性

    Possibility of Directly Linking with Gas Pipe of Coke Furnace Without Replacement

  2. 而其学风则由玄学的境界本体論,再下接引般若佛性論,其影响可谓深远。

    Moreover , the school discipline had a deep and far influence from ontology of metaphysics to Buddhadhatu theory .

  3. 漫游的鸽子飞回方舟,挪亚就伸手接引它;

    When the wandering dove returns to the ark , Noah puts out his hand to pull her in unto him .

  4. 因阿弥陀佛能接引念“南无阿弥陀佛”的信徒往生西方净土,所以又叫“接引佛”。

    Because Amitabha can receive disciples who intone Namo Amitabha to the West Pure Land , he is also called the Receiving Buddha .

  5. 乾嘉时期,中国内地的天主教徒不断通过澳门接引传教士,辗转进入内地传教。

    In the period of Qianlong and Jiaqing , the mainland Catholic led the missionaries through Aomen and came into mainland to spread religion .

  6. 我们芸芸众生的命运,可以说在佛的法身当中,佛都有接引的。

    In a way , the fate of us is within the Dharmakaya of Buddha-we are under the guidance and reception of Buddha at all times .

  7. 接引寺接引寺在沿江镇清潭头水库坝下左侧,寺悬崖而建,峻险壮丽。

    Jieyin Temple Built against the cliff , the magnificent and grand temple is on the lft side below the dam of Qingtantou Reservoir in Yanjiang town .

  8. 传说此花只开在冥界三途河边、忘川彼岸的接引之花,是冥界唯一的花。

    This took only a legend in Mingjie three passers-by river , Sichuan Forgot Jieyin the other side of the flower , a flower is the only Mingjie .

  9. 此石佛为阿弥陀佛接引像,右手下垂作接引状,左手当胸捧紫金台。

    The statue depicts Amitabha guiding believers to the Land of Ultimate Bliss , with his right hand hanging down and his left hand holding a lotus throne against his chest .

  10. 电气设备接地引下线导通测试及分析

    Continuity Test and Analysis for Ground Down Lead of Electrical Equipment

  11. 一种基于分层约简模型的含接地引下线的接地网故障诊断方法

    A Hierarchical Model Based Corrosion Diagnosis Approach for Grounding Grid with Down Lead Lines

  12. 接地引下线与导电地网和地下接地体的连接应牢固、可靠。

    Connection part between the earth connection cable and the conduct floor net and underground earth object should solid and reliable .

  13. 由于接地网引下线间端口电阻的测量属于小电阻测量,其测量误差势必会极大的影响诊断结果。

    The resistance between the ports of the down lead conductor of the grounding grid is small , thus its measurement inaccuracy may have great influence on the diagnosis result .

  14. 在经常发生雷击的易击杆塔上安装线路型避雷器,采用杆塔接地引下线直接引下接地避免以往引下线连接不牢,采用导电水泥对杆塔接地体进行处理。

    Some of the details were installing line arrester on lightning susceptive towers , using tower down lead to ground directly and to avoid unsound grounding and adding conductive cement to tower base and grounding electrode .

  15. 介绍了利用接地引下线导通测试仪测试电力设备接地引下线的方法及注意事项,并对若干测试数据进行了分析,给出了判定导通状况的参考值。

    The Method and points for attention for using continuity tester of ground down lead to test the ground down lead of electrical equipment have been introduced , several test data have been analyzed and the reference value to determine the continuity state has been given .

  16. NSA-500-1型氩弧焊机VD9不同接法对引弧和稳弧的影响

    Influence on different VD 9 joint to arc initiation and stability of NSA-500-1 argon-arc welding machine

  17. 无外接电源轻便引弧器的研制

    Development of portable arc striking apparatus without outside power

  18. 介绍无外接电源轻便引弧器的组成部分及工作原理。

    The paper describes the component parts and the mechanism of portable arc striking apparatus without outside power .

  19. 接地装置引下线的导通检测工作应每年进行一次并进行记录、分析。

    Grounding device Yin Xiaxian of conduction testing should be conducted once a year , and recorded and analyzed .

  20. 光缆在放线完毕后,如不能立即熔接,应将引下线盘起固定于铁塔较安全的位置上,以防人为损坏。

    If the optical cable fails to weld immediately after setting , the downlead shall be coiled and placed in a safe location to avoid human damages .

  21. 结合相关雷电知识,对爆炸危险环境建筑物的防雷设计,如接闪器、引下线、接地装置、特殊建筑物等防雷装置及设施的设计进行详细的探讨。

    With reference to the knowledge of thundering and lightning ,, this paper analyzed in detail the designing against lightning protection device and facility in explosive and dangerous environment , such as arrestor , earth lead , earthing device , special building , etc.

  22. 本文根据故障诊断学原理、网络理论、矩阵理论及计算机算法,使用接地网拓扑结构图及接地网引下线间的电阻测量值,建立接地网腐蚀诊断方程。

    According to fault diagnosis theory circuit principle and matrix theory , This paper introduces the math model and equation of fault diagnosis method .

  23. 利用接地网拓扑结构图及接地网引下线间的电阻测量值,建立腐蚀诊断方程,通过求解诊断方程,计算出接地网支路电阻值变化量,采用模糊诊断方法判断出接地网导体腐蚀的情况。

    According to the topology of the substation and resistance measurements of down-leaders , the erosion diagnosis equation is built and the resistance variations of grounding grid branches are solved , and the erosion of grounding grid could be found through the fuzzy diagnosis regulation .

  24. 论文利用接地网拓扑结构图及接地网引下线间的电阻测量值,建立了基于接地网支路电阻相对变化量的腐蚀诊断方程,并通过添加正则化因子的改进拟牛顿迭代法求解诊断方程。

    Basing on the structure chart and the measured value of the resistance between the down lead conductor ports , the thesis constructs the relative variation of branch resistance dependant erosion diagnosis equation and solves this equation through the improved Newton iteration method by the introduction of the regularization factor .

  25. 应根据接地系统图,在地网上焊接接地引下线。

    Weld the earth connecting cable on the floor net which also based on the floor system drawings .