场地平整
- site levelling;levelling of ground
-
基于Web的场地平整优化设计系统
The site leveling optimization design system based on Web
-
NET与AutoCAD相结合开发场地平整优化设计系统的设计思想,并详细介绍了在场地平整优化设计中数学模型的建立。
NET and AutoCAD , also it gave a detailed introduction on how to build up the optimal design in the establishment of mathematics model .
-
介绍用三角形网格法确定场地平整设计平面的原理和用线性规划计算调整设计平面后非平衡土方调配方案的方法,并用电子表格软件Excel进行实例设计计算。
Principle of designing construction plane for ground leveling with triangle grid and method of calculating the deployment scheme of unbalanced earthwork with linear programming are introduced . A case calculated by Excel is given .
-
场地平整中土石方量计算的三维可视化方法
3D-visualization method of earthwork computation in leveling off the construction ground
-
多排微差爆破技术在场地平整中的应用
Application of Millisecond Multiple-row Holes Blasting Technology in Ground Leveling Blasting
-
场地平整填挖面积和体积计算方法的探讨
Comments on Calculating Method for Filling-Digging Area and Volume of Ground Leveling
-
在大型的工程和建筑项目中,经常要进行场地平整工作。
On working Heavy engineering and construction projects often require terrain modifications .
-
对场地平整土方量计算公式的分析与建议
Analysis and Advice of Field Leveling Earth Volume Calculation Formulas
-
场地平整土方工程量计算中场地设计标高的调整
Revising of design elevation for leveling a site in calculating of earthwork
-
用图上作业法确定场地平整中的最佳设计平面
The determination of the optimum design plane in site preparation by Diagramming Method
-
建筑场地平整土方量的优化计算
Optimized Calculation of Earthwork for Leveling up Construction Site
-
加筋土挡墙在变电站场地平整工程中的应用
Application of the reinforced earth-retaining wall in the site smoothing project of electric substation
-
场地平整施工方案设计方法
Design Method of Construction Scheme for Ground Leveling
-
场地平整竖向设计中重心定位的力学方法解算
The mechanical solution for locating the center of gravity in leveling fields with vertical design
-
数据库技术在大面积场地平整施工方案优化中的应用
The Application of Database Technology in Optimizing the Construction Scheme of Leveling up Large Fields
-
分形理论与数字滤波的插值方法在场地平整土方量计算中的应用
Application of Interpolation Method Based on Fractal Theory and Digital Filtering in Calculation of Earthwork
-
核电站场地平整阶段总布置设计探讨
Discussion on general layout design in " ground leveling " stage of nuclear power station
-
支护和场地平整。
Shoring and site formation works .
-
不规则地形场地平整设计的面积加权法
The method of weighted sum area in the design of leveling the ground of irregular topography
-
几种现有高效技术的综合应用。4.曲面拟合在场地平整中的应用。
Integrated application of several existing efficient technologies . 4 . Application of surface fitting in site formation .
-
介绍了以四角棱柱体土方公式为计算模型的试算法确定大型场地平整最优设计标高近似解的方法。
In this paper , the approximation calculation method based on calculation model of earthwork formula of tetragonal prism is described .
-
在满足土地复垦用途要求的前提下,设计场地平整参数,提高平整土方量计算精度。
The purpose of this study is to ascertain the unknotting parameter of the land reclamation field and improve the count precision of earthwork quantity .
-
我认为可以这么理解,我们实现了以下四个目标:水通、电通、路通、场地平整。
We have achieved the following goals : water and electricity can be used , the road is open to traffic , the ground is leveled .
-
承接各种土石方工程、场地平整、高层楼框架拆除、石方爆破。
Undertake : Our Company runs various project , such as soil construction , ground treatment , high building demolish , blow-up project and so on .
-
研究结果:用最小二乘法设计场地平整参数的法方程、土方量计算公式及其精度分析公式。
The results of it are the working equation , the count formulae of earthwork quantity and the precision analysis in planning the Unknotting Parameter of field in the use of least squares .
-
而物流区基础配套设施为入园企业提供标准的七通一平,主要包括道路、给排水、污水、电力、通讯、燃气、热力及场地平整,且基础配套设施接至规划红线。
The logistics area-based facilities for the joint venture provides a standard of " seven connections and one leveling ", including roads , drainage , sewage , electricity , telecommunications , gas , heat and site preparation , and infrastructure is connected to the red line plan .
-
主要设计用途为场地的平整度测量。
The main design is used for the flatness measurement .
-
佐敦谷场地开挖及平整工程是香港有史以来在市区内进行的最大规模爆破工程。
The project of " Site Formation and Associated Infrastructure Works at Jordan Valley " is the largest urban blasting project in the history of Hong Kong .
-
房屋附近用砖石等铺平的供用户活动的场地。部分已平整的地盘已开始建设房屋。
Building development has also begun on some of the formed sites .
-
结合某建筑工程项目广场场地填筑施工实践,探讨场地平整中填土体填筑碾压现场控制工艺和方法。
The fill control techniques of site formation compaction quality , and the construction control indexes to control the filling soil reclamation effectively are developed in this paper .