不断改进工艺技术,实现国产化,形成先进的工艺技术,不断优化工程设计方案,推行多版次设计,设计、采购、施工合理交叉,缩短建设周期。
Optimizing engineering design options , multi-revision issuing of design drawings , rational parallel works in design , procurement and construction and shortening construction period are carried out .