全玻璃幕墙
-
全玻璃幕墙结构中面板的设计计算
Study on panel designs of completely glass curtain wall
-
全玻璃幕墙施工方案
Construction Scheme of Full Glass Curtain Wall
-
第三章,建立了遮阳模型,分析照光高度的影响因素,研究遮阳对全玻璃幕墙建筑太阳直射辐射负荷的影响,并提出了遮阳策略;
The third chapter establishes the sun shade mode , analyzes the influencing factor for light height , studies the influence of outside sunshade to solar direct radiation , and puts forward the sunshade strategy ;
-
从全玻璃幕墙施工的前期施工准备、吊挂式全玻璃幕墙安装施工工艺、保养和维修3个方面做一个系统全面的论述,确保全玻璃幕墙施工安装质量。
In this article , authors introduce the early construction preparation of full glass curtain wall , construction , and present the installation technique , maintenance of hanging type full glass curtain wall , which ensure the installation quality of full glass curtain wall .
-
全玻璃幕墙利用玻璃的通透性,应用在各类大型公共建筑中,且已发展成为玻璃肋胶接全玻璃幕墙、桁架式点连接全玻璃幕墙、拉索式点连接全玻璃幕墙等。
The full curtain glass wall applies in every kind of large public building by utilization of glass transparence . It has been developed into full glass curtain walls with glass rib adhesive joint , truss type point connection and bracing rope point connection .
-
通过对全隐玻璃幕墙渗水原因的分析与研究,从设计、材料、施工和管理等多个方面提出了防治措施,以解决常见的玻璃幕墙渗水问题。
Through a practical example , this paper analyses the cause of seepage water of basement , and puts forward a plan to deal with it .
-
一种基于FFT功率谱的全隐框玻璃幕墙结构胶脱粘长度检测方法
New damage detection method of structural silicone sealant in hidden frame supported glass curtain wall based on FFT power spectrum