管理建议书

  • 网络Management letter
管理建议书管理建议书
  1. 公司内部控制制度评价与管理建议书的关系

    Management Proposal and Internal Control System

  2. 对工程造价管理从项目建议书阶段、可行性评估阶段、设计阶段、施工阶段、竣工验收阶段以及后评估阶段造价管理的控制进行了分析,指出了造价管理在全过程控制的重要性。

    According to the engineering cost management in suggestion stage , feasibility evaluation stage , design stage , construction , acceptance and post-evaluation stage analysis is carried out for cost control . The important roles of cost management acted in the whole procedure control are pointed out in the end .

  3. 环境及档案管理委员会和员工建议书计划年内不断向各员工收集有关环保措施的意见。

    Suggestions on green measures were continuously sought from staff through the environment and records management committee and the staff suggestions scheme .