成本目标
- 网络cost target;cost objective;Cost object
-
其次,建立了成本目标优化模型,提出控制法则并给出控制算法;
Second , The model of the cost objective optimization is established , a general optimal control law and control algorithm are proposed .
-
另一方面,必须根据确定的成本目标控制实际成本的支出,并采取措施努力降低成本。
The cost objective set by basis controls the actual cost disbursement on the other hand , be obliged to , adopts and measure effort cost reduction .
-
将数据包络分析(DEA)的两阶段法扩展到了输入输出是模糊数的情况,并应用于新型民机的维修成本目标评估之中。
A two-stage data envelopment analysis ( DEA ) approach with fuzzy inputs and fuzzy outputs is studied , and an application for the maintenance cost target estimation of the new civil aircraft is also presented .
-
资源受限工程调度问题的研究中很少关注活动成本目标,而问题中以活动成本最小化为目标时也是一类NP-Hard问题,并且问题目标是非正规的。
There is little attention paid to activities ' cost of project in resource-constrained project scheduling problems ( RCPSPs ) . When the objective of minimizing activities ' cost is considered as the performance measure , the problem is also NP-hard and the objective is nonregular .
-
成本目标是公路施工企业管理的中心
The Cost Goal Is the Center of Highway Construction Enterprises Management
-
基于优先规则的活动成本目标资源受限工程调度
Priority-rule-based Resource-Constrained Project Scheduling with the Objective of Minimizing Activities ' Cost
-
新型民机维修成本目标有效性评估方法
Evaluation Method for Maintenance Cost Target of New Civil Aircraft
-
实行生产成本目标管理责任制;
( 2 ) implementing production cost management accountability ;
-
加强成本目标管理是施工企业巩固和发展的有效途径
Strengthening Cost Goal Management Is Effective Way of Consolidating and Developing Construction Enterprises
-
试论房地产项目成本目标的管理
Management by cost object of real estate project
-
船舶设计成本目标管理
Management by Object on Cost for Ship Design
-
一个流畅的流程运作是满足我们生产目标和成本目标的关键。
A smooth flow is the key to meeting our production goals and cost targets .
-
施工阶段主要是按成本目标在作业中进行有效的控制;
In execution class , it is the main purpose to control the special activities effectively .
-
用成本目标管理项目
Project management based upon cost goal
-
销售和成本目标;
Sales and cost targets ;
-
每个软件项目都会以不同的方式受到范围、时间和成本目标的约束。
Each project will be in a different way by the scope , time and cost target constraint .
-
成本目标管理的质量直接关系到工程项目管理的成败。
The quality of the cost target management has direct relations to the success or failure of the engineering project management .
-
因此,必须严格费用开支的审核和控制,以确保成本目标的实现。
Therefore , must make strict examination / verification and control for the expenditures , guaranteeing the realization of the cost target .
-
论述了成本目标在公路施工企业管理中的重要性,提出了推行成本目标的几点做法。
The paper discusses the importance of cost goal in highway construction enterprises management and proposes some methods of implementing cost goal .
-
作业成本目标控制系统由前馈、过程、反馈控制三大子系统构成。
The system of activity-based cost control by objectives is formed of the three subsystems : feed forward , course and reaction control .
-
有效管理采购渠道,及时开展相关采购来支持当前项目及新项目,并满足成本目标和时间要求。
Manage the purchasing pipeline , develop timely purchasing actions in support of current and new programs and meeting cost targets and timing .
-
在考虑整体成本目标和个体企业约束条件的基础上,建立了一个供应链构建决策模型。
By considering the cost objective of the whole supply chain and the constrain conditions of the individual enterprise , we build a decision model for supply chain formation .
-
从技术的角度,围绕品质目标和成本目标,针对不同线束的不同材质要求,提出精细设计理念,达到降低线束成本的目的。
According to quality goal and cost goal , aiming at different demands of different wiring harness , the idea of delicate design to reduce the cost of wiring harness is discussed here .
-
这两个部分分别研究了多项目的优先级评价方法和基于项目优先级与成本目标的人力资源配置问题。
These two components have researched on the following aspects , i.e. the evaluation of the multi-project 's priority and the human resource allocation based on the priority and the cost of the projects .
-
根据某炼油厂柴油生产流程,在成本目标函数中加入加氢精制的组分比例和加工成本,建立可变成本的双线性规划模型。
A bi-linear programming model with variable cost has been established based on the production flow scheme of a refinery and the hydrofining component ratio and process cost is added in the cost target function .
-
基于此,本文首先对活动成本目标下的资源受限工程调度问题展开研究,然后将有关理论与方法应用到工程供应链设计中。
For the above , resource-constrained project scheduling with the objective of minimizing activities ' cost will be discussed firstly based on which research on design of construction supply chain is going to be carried out .
-
数学模型求解后的结果表明:控制丙烯精馏塔塔底再沸器的加热量,可以使成本目标函数达到最小值,从而实现该塔的在线优化。
It is shown by solving the mathematical model that the cost target function can be minimized by controlling the heating power in the reboiler at the tower bottom , so that the online optimization is realized .
-
特别是在循环体系的构建中,对企业预算目标、预算目标的确定、预算目标的指标选择、目标利润的分解、成本目标的分解进行了详细的讨论。
Especially , in the construction of Recycling System , the article gives detailed discussion at the aspects of budgeting target and its finalization , index choice of budgeting target , disassembling of target profit and target cost .
-
由于成本目标的达成是通过过程来完成,要实现理想的目标成本控制效果,必须同时引入过程控制管理的思想。
Because it is to finish through the course that goal of the cost is reached , the goal cost realizing ideal controls the result , must introduce the thought that the course controls management at the same time .
-
在项目施工过程中要达到预定的成本目标,应采取有效措施,对费用进行控制、对项目成本的趋势进行分析和预测,保证项目控制目标的实现。
In project construction process , as to reach to predetermined cost goal , we should take the effective measure to control the expense and to analyze and predict the project cost tendency for purpose of the realization of cost control goal .