工料机

工料机工料机
  1. 在GK公司职工活动中心工程施工项目中,未能建立施工现场的工料机等资源的实时管理系统,未能对项目的成本指标进行实时控制。

    GK company workers in the center construction projects , failed to establish a construction site and other resources of the quantity of real-time management system , the failure of the project cost index for real-time control .

  2. 结合工程实际,介绍了主动型安全防护网中GPS2型SNS柔性防护网的优势、作用、原理及施工工艺,并对工料机消耗进行了统计分析。

    Combined with construction practice , this article makes an introduction to the advantages , function , principle and construction workmanship of the SNS flexible protecting net and also performs an analysis of the consumption of labour , materials and machines of the same in construction .

  3. 国外工程工料机单价的确定方法

    Method for determining unit price of labour , materials and machines of foreign projects

  4. 国际工程投标工料机费用计算

    Computation of cost for labour , materials and machines in bidding for international engineering projects

  5. 合理确定工料机单价是国外工程估价的基础和关键。

    To determine reasonably the unit price of labour , materials and mach ines constitutes the basis for and key to estimating foreign projects .

  6. 此文结合工作实际,较全面地探讨了国外工程工料机单价的确定方法。

    This article makes an exploration , combined with the work experience , of the method for determining the unit price of labour , materials and machines of foreign projects .

  7. 因此,分析与确定这些分项工程的工料机消耗量,编制科学的补充定额,可合理确定工程造价,并为同类工程提供借鉴。

    The analysis and determination of the consumption of labor , materials and machines of the partial works and the preparation of scientific additional norms can rationally determine the engineering cost and provide reference to projects of a similar nature .

  8. 工程项目施工成本中的工料机单价,要以实施性施工组织设计和实际施工数量为基础,遵循实事求是的原则,按照一定的程序,采用科学的方法来合理确定。

    The unit price in the construction cost of engineering projects should be founded on the operative construction organization design and actual construction bill of quantities and be determined based on facts , in light of certain procedures and by using scientific method .

  9. 此文探讨如何利用国内现有定额的消耗量,在国际工程投标中迅速进行工料机用量分析和单价计算。

    This article is written to explore how to make use of the consumption of the current norms at home to quickly perform the quantitative analysis and unit price computation of the labour , materials and machines in international bidding for engineering projects .