锅筒

  • 网络drum;boiler;boiler drum;Steam drum
锅筒锅筒
  1. 用SLPC可编程调节器实现对废热锅炉上锅筒水位的自动控制

    Automatic Control of Heat Recovery Boiler Drum Water Level by Use of a SLPC Programmable Regulator

  2. 以300MW锅筒为例,探讨和分析了300MW以上锅筒的制造质量控制。

    Combining an example for 300 MW drum , the manufacturing quality control of high capacity boiler over 300 MW are analyzed .

  3. 300MW机组锻造锅筒材料SA299的试验研究

    Experimental Study on Forged Material SA 299 for 300 MW Unit Drums

  4. 300MW亚临界自然循环锅炉锅筒内部设备布置

    Arrangement of Drum Internals for 300 MW Sub - critical Pressure Boiler

  5. 介绍了开发设计的300MW亚临界自然循环锅炉锅筒内部设备及相关分离设备的结构和性能。

    The drum internals of 300 MW sub - critical pressure boiler and its separator are introduced .

  6. 300MW机组锅炉锅筒下降管焊接裂纹的分析和研究

    The Analyse and Study into the Cause of Formation of the Welding Crackle for the Downcomer of 300 MW Boiler Steam Drums

  7. 文章以DBC制造的300MW“W”形火焰锅炉为例,详细地介绍了锅筒、水冷壁、燃烧器和水冷壁集箱的典型结构和制造方法。

    The paper gives a detailed introduction to the typical structure and manufacturing method of drum , waterwall , burner and waterwall header of the300MW double arch furnace boiler produced by DBC .

  8. 阐述了将DZL型热水锅炉锅筒排污管改为吸污引射两用管的具体方法,此方法能有效地预防锅筒底部水渣沉积和锅筒鼓包、破裂等问题的发生。

    This article illustrates the detail method to change the sewage discharge pipe of DZL type hot water boiler barrel to sewage induction and spraying pipe .

  9. 叙述以锅筒的WPL为对象,进行了PC编制的探索,并对某电站锅炉WPL文件的主体部份(DWPL)采用了计算机编制,初步使用结果表明,PC编制有利于提高编制效率和文件质量。

    WPL for boiler drum is described in this paper with researches on PC programming . Main part of WPL documents for a utility boiler is programmed . Initial application results show that PC programming is favorable to improve compiling efficiency and document quality .

  10. 介绍了D25型长大平车运输DG1025/18Z&Ⅱ7型锅筒的装载加固方案,对装载结构的稳定性进行了分析,并对主要承载部位的强度进行了有限元分析。

    The loading and securing scheme for the DG1025 / 18Z 117 boiler cylinder transported by the D 25 high capacity flat car is described . The stability of the loading structure is analyzed , and finite element analysis is done for the main load bearing parts .

  11. 卧式水火管热水采暖锅炉锅筒鼓包原因及防治

    Swelling on drum of horizontal water-fire tube boiler and preventive measures

  12. 双锅筒横置式热水锅炉水循环的设计

    Design of Water Circulation of Two Transverse Drum Hot Water Boiler

  13. 大容量电站锅炉锅筒压制焊接变形

    Study on welding deformation of pressed steam drum for utility boiler

  14. 锅炉锅筒吊杆销轴强度校核计算程序

    Calculation Program for Strength of Pin for Hanger Rod of Drum

  15. 锅筒排污水炉内切向喷雾强化燃烧

    Tangential Spray Intensified Combustion in a Boiler Furnace with Continuous Blowdown

  16. 经技术改进的埋弧自动焊在高压锅炉锅筒上的应用

    The Application of Improved Auto-submerged Arc Welding on High Pressure Boiler Durm

  17. 锅筒《焊接生产工艺一览表》的计算机编制

    Computer Programming of Welding Procedure List ( WPL ) for Boiler Drum

  18. 锅筒鼓包爆裂事故原因分析与预防措施

    Analysis of Causes of Boiler Explosion Accident and Preventing Measures

  19. 锅筒用钢实用焊接工艺介绍

    Introduction on the Practical Welding Procedure for Boiler Drum Steel

  20. 电站锅炉锅筒的热应力分析及对策

    The Analysis and Control of Thermal Stress on Power Plant Boiler Drum

  21. 锅炉锅筒水位监控系统的应用原理

    Priciples of Application of Boiler Drum Water Level Monitoring System

  22. 锅筒疲劳计算的判别条件和考核点

    The Judging Conditions and Examination Points in Fatigue Calculation of Boiler Drum

  23. 锅筒环缝石棉衬垫法埋弧自动焊焊接工艺

    Asbestos mat welding technology of automatic submerged-arc welding for boiler 's canister ring-seam

  24. 介绍了双锅筒横置式热水锅炉的水循环方式。

    This paper introduces the water circulation of two-drum transverse hot water boiler .

  25. 锅筒式蒸汽锅炉水处理工艺设计计算

    Calculation of the Water Treatment Technological Design of a Drum Type Steam Boiler

  26. 锅炉锅筒在实测边界条件下的应力场三维有限元分析

    Fatigue Life Estimate of Boiler Drum Based on Actual Boundary Condition Stress Solution

  27. 锅炉锅筒下降管三通的三维有限元自动剖分

    Automatic Generation of Three-Dimension Finite Element Mesh on Boiler Drum and Downcomer Tees

  28. 锅筒式锅炉差压式水位计的温度补偿研究

    Temperature Compensation Study of the Differential-pressure Water Gage Used for a Drum Boiler

  29. 锅筒吊杆尺寸超差问题分析及解决方法

    Analysis and Solvent of the Problem of Hanger Rod of Drum Dimension Exceeds

  30. 锅筒与水管连接焊缝渗漏的原因分析

    Analysis of Reason on Weld Bead Leakage Between Boiler Shell and Water Pipe