矿井防水
-
矿井边界防水煤柱管理技术研究
Management Technology Study of Water-Proof Coal Pillar of Mining Border
-
对于受水害威胁的矿井,防水闸墙是井下防水的主要安全设施。
The water proof gate is the main safety facility against underground water to the coal mine threatened by water disaster .
-
为了防止煤矿井下透水事故的发生,对五阳矿井下防水工程进行了一系列设计和施工,并作了防水闸的压力试验,取得了良好的效果。
In order to prevent water burst , a serious of waterproof project were carried out in Wuyang mine , which included waterproof gates and achieved good result .
-
通过对百善煤矿松散含水层下合理煤岩柱高度进行研究分析,为该矿和条件类似矿井缩小防水煤柱、提高上限采煤提供了可靠的依据。
By means of the study and analysis of rational coal and rock pillars height under the loose water-bearing strata of Baishan Coalmine , the reliable basis is provided for reducing the water-bearing barrier and enhancing the upper limit for coal mining in Baishan Coalmine and other similar coalmines .