工程预决算

工程预决算工程预决算
  1. 基建工程预决算专业的教学改革应与时俱进。

    Construction Project Budgeting and Final Accounting Specialty should undergo reforms .

  2. 建筑工程预决算审查及投资控制

    On the Investigation of Budget and Final Accounts of Architectural Projects and Investment Control

  3. 审核工程预决算时应注意的几个问题

    Several Problems on Auditing Budget and Final Account

  4. 本文根据工程预决算工作的特点,论述应用微机编制预决算的重要性。

    Basing on the characteristics of engineering budget making , the importance of microcomputer application in budget making were discussed .

  5. 着重于对土建施工图预算六种审查方法的分析讨论,帮助工程预决算人员采用适当的方法合理确定土建工程造价。

    Focus on analysis and discussion on six auditing methods for a civil construction project , help civil construction project management personnel to adopt appropriate methods to decide the reasonable budget for a civil construction project .

  6. 本文详细介绍了在应用神机妙算工程预决算套价软件时土建、装饰、安装混合模板的编制,为神机妙算工程造价套价软件的操作实践提供参考。

    This article introduces the compilation of mixing model of civil construction , decoration and installation with " Shen Ji Miao Shun " Set-Price Software for construction budgeting and estimating , giving reference for the operation practice of the " Shen Ji Miao Shun " Software .

  7. 建筑工程的预决算是确定和控制工程项目投资的重要文件,它需要有高度的科学性、准确性及权威性。

    The engineering budget and final accounts is a very important document about controlling and determining the project capital in construction engineering .

  8. 输入输出装配-程序V以下输变电工程施工,电力工程预决算,电力器材销售设备维修等。

    Input / output pack KV power transmission project following the construction , electrical engineering fields , power equipment sales equipment maintenance .

  9. V以下输变电工程施工,电力工程预决算,电力器材销售设备维修等。火力发电厂修配设备及建筑面积配置标准

    KV power transmission project following the construction , electrical engineering fields , power equipment sales equipment maintenance . Standard for furnishing maintenance device and architectural area of fossil fuel power plant

  10. 加强工程造价管理,控制工程预决算;

    Fortify management of engineering cost ; control final accounts of engineering ;