丰满大坝
- 网络fengman dam
-
丰满大坝纵缝上部未设键槽,蓄水前又未灌浆;
There are no key-ways made in the upper longitudinal joints in Fengman Dam and no grouting before impounding .
-
文中介绍了丰满大坝纵缝的设计、施工、后期处理情况,纵缝在运行中的开度变化观测情况和纵缝的挖槽调查情况。
The design construction and after-treatment of the longitudinal joint at Fengman dam , along with the joint opening change and digging pit examination is introduced in the paper .
-
丰满大坝坝体开槽防渗加固数值模拟分析
Numerical modeling analysis for dam body about the project of seepage prevention and reinforcement on Feng mang dam
-
本文对丰满大坝溢流面新浇混凝土裂缝进行了表面调查、无损性态检测;
The surface crack investigation and no damage detection have been researched into new pouring concrete on the overflow dam .
-
本文介绍了丰满大坝60年来安全管理的特点、历程及经验,从大坝防汛、大坝监测、大坝补强加固等方面进行了全面总结,并阐述了今后丰满大坝安全管理工作的发展思路。
This article introduces the characteristics , course and experience of safety management for 60 years , sums up the aspects of the dam flood control , dam rehabilitation and dam monitoring . The developing consideration on further work on dam safety monitoring is presented .