计划值
- 网络Planned value;Plan value;planning value
-
在每个测定阶段,计划值被配置给每个成就水平任务。
Planned Value is assigned to each LOE task for each measurement period .
-
在测定阶段结束时,这些计划值就自动变成赢得值了。
This Planned Value is automatically credited as the Earned Value at the end of the measurement period .
-
KPI的目标值所表示的是企业经营的计划值,KPI的实际值反映了企业实际的运营状况。
The target value of KPI denotes the plan of the enterprise ; the actual value of KPI reflects the running condition of enterprise .
-
用SCC-MPC策略设计多区域电力系统的负荷频率控制器,仿真结果说明系统在受到负荷扰动时,SCC-MPC控制器使系统频率趋于正常值,区域间的交换功率也趋近于计划值。
The control scheme was applied to multi-area load frequency control ( LFC ) . Simulation results show the performance of the scheme . When the areas suffer from load disturbances , the frequency variations and the deviation of power flow between areas go to zero by using SCC-MPC scheme .
-
进一步研究了利用赢得值原理进行工程造价控制的四个基本参数的计算方法,及时找出工程实施过程中实际值与计划值的偏差、了解工程实际的实施状态;
It studies the way of calculating about four basic parameters of construction cost by utilizing the Earned Value Concept .
-
解释实用工具输出能够很方便地显示实际基数(片段实绩)和估计的基数计划值,供您进行比较。
The explain facility output conveniently displays the real cardinality ( section actuals ) and the estimated cardinality plan values for your comparison .
-
注:本表前四项指标按地域统计,其余指标均为国家科委火炬计划值。
Note : The first four indices in this table are on basis of region , and others refer to Torch Plan of State Scientific and Technological Committee .
-
该方法不仅能维持区域系统对外净交换功率的计划值,同时还可分别维持每条联络线交换功率的计划值,而且提高了控制实施的有效性。
This control method may not only restrict the area subsystem net exchange power with other subsystem to the plan value , but also restrict every tie line transition power separately kept to the constant power .
-
放疗计划CT值的校准检测及其影响因素分析
Calibration of CT Values Used for Radiation Treatment Planning and Its Impact Factors
-
基于可信性理论的生产计划期望值模型
Production Planning Expected Value Model Based on Credibility Theory
-
理想的情况是,根据被计划的值比较实际被开发的代码以确定还有多少工作需要做。
Ideally , compare actual code developed against planned values ( not shown ) to determine how much work remains to be done .
-
该模型实现了对工程项目成本的动态管理,使企业能够实现工程项目成本计划目标值。
So , it can realize the achieve dynamic management of engineering projects cost and assure that enterprise realize target value of engineering project cost .
-
它演示如何计算必须的计划利润值,以填补标准化住宅与增加费用后的零能耗方案之间的造价差额。
It shows how to calculate the value of planning gain needed to level the playing field between standardized house building and the increased costs associated with a ZED scheme .
-
治疗计划系统中CT值及图像质量保证的若干问题讨论
To discuss several question of quality assurance of CT value and image using by treatment planning system
-
结果后装治疗计划系统的理论值与热释光计量计实测值有较大差异。
Results The theoretic outcomes of afterloading planning system was markedly different from that of actual measurement with thermoluminescent dosimeter .
-
然后优化器会使用新创建的索引和在其上收集的统计信息来更正查询访问计划的基数估计值
With the new index created , and statistics collected on it , the optimizer corrects the cardinality estimate of the query access plan
-
在工作项编辑器中更改工作项,以便团队区域和迭代与创建计划时指定的值匹配
By altering a work item in the Work Item editor so that the team area and target iteration match the iteration plan 's target iteration
-
虽然这个访问计划比使用具体值但没有分布统计信息情况下的访问计划好,但不如既使用具体值又有分布统计信息时的访问计划。
Although the access plan is better than the access plan with concrete values without distribution statistics , it is worse than the access plan with concrete values with distribution statistics .
-
当用户创建计划订阅时,此计划值在订阅管理界面上定义。
The schedule value is defined in a subscription management interface when the user creates a scheduled subscription .