竣工验收阶段
- 网络Project Acceptance
-
结合淮北市北外环C1段市政工程的案例,从施工准备阶段、施工阶段和竣工验收阶段对如何进行项目施工的成本控制进行了探讨,以使企业取得良好的社会效益和经济效益。
Combined with north circumferential municipal works in Huaibei city , from three stages : preparation stage , construction stage and acceptance stage measures for construction cost control are discussed in order to acquire good social and economic benefits for enterprises .
-
竣工验收阶段寻租博弈分析
Game Analysis of Rent-seeking in Tests on Completion
-
就竣工验收阶段分析了监理工作的主要内容。
In the stage of checking and accepting project main content of supervision work are analyzed .
-
文章分别就建设项目决策阶段、实施阶段、竣工验收阶段、试运行阶段、建设单位财务收支等方面的跟踪审计内容和方法进行了阐述,并提出了跟踪审计应注意的三个问题。
It elaborates the content and method relating follow-up auditing from the stage of division , implementation , completion and check acceptance , trial operation and financial revenue and expenditure and three points for attention .
-
为实现绿色施工,针对监理工程师的责任、义务,从监理工程师的自身素质、工程的施工准备阶段、工程的实施阶段及竣工验收阶段几方面,提出了加强工程建设环境保护管理的措施。
In order to realize environmental friendly construction this paper from the responsibility and duties of supervision engineers , their qualities , preparation stage , acceptance stage and other aspects proposes some measures to strengthen environmental protection management for construction engineering .
-
监理的全过程投资控制就是发挥监理的职能作用,对项目建设投资决策阶段、设计阶段、施工阶段和竣工验收阶段的工程造价进行控制,以保证项目管理目标的实现。
The all process investment of control to supervision is bringing the supervision function effect into play , control construction costs in investment decision stage , design stage , construction stage , completed stage , to ensure that the project manages the target realization .
-
建设前期阶段,从机会研究到发放中标通知书;建设期阶段,从收到中标通知书到竣工验收阶段;建设后阶段,从竣工验收到工程报废阶段。
Pre-construction stage , from the opportunity studying to the issuing bid notice ; the construction stage , from receiving the notice to the successful completion and acceptance phase ; after the construction phase , from the stage of completion and acceptance to the project scrapped .
-
简述了进行建设项目工程造价控制的必要性,从投资决策阶段、设计阶段、工程实施阶段、竣工验收阶段四方面介绍了有效控制工程造价的措施,从而促进经济建设的快速发展。
It elaborates the necessity of project cost control in constructional item , introduces the measures to control project cost effectively from four aspects : investing and decision-making stage , designing stage , constructing stage and finishing stage , in order to promote the fast development of economic construction .
-
对工程造价管理从项目建议书阶段、可行性评估阶段、设计阶段、施工阶段、竣工验收阶段以及后评估阶段造价管理的控制进行了分析,指出了造价管理在全过程控制的重要性。
According to the engineering cost management in suggestion stage , feasibility evaluation stage , design stage , construction , acceptance and post-evaluation stage analysis is carried out for cost control . The important roles of cost management acted in the whole procedure control are pointed out in the end .
-
论述了从初步设计到工程竣工验收各个阶段工程建设的造价控制。
It is discussed how to control the cost of a project in its various stages from the beginning of design to the cheeking before acceptance .
-
本文采用全过程造价控制理念,从工程决策、设计、施工、竣工验收等阶段分别阐述各个阶段工程造价中存在的问题,并提出解决的对策,并应用技术经济方法予以控制。
This paper using the concept of the whole process cost control , respectively according to the decision-making phase , design phase , construction phase , completion phases , point out the existing problems and the accordingly solutions , and the application of technical and economic measures .
-
从施工准备、施工过程、竣工验收三个阶段做好施工监理工作。
The author 's perception in preparation of construction , process of construction and final acceptance are depictod .
-
水利工程建设项目都需经历项目决策、设计、施工和竣工验收等几个阶段。
The construction of water project need to go through project decision , design and construction with is completed check and accept .
-
在具体实施过程中,针对项目施工准备、现场施工以及竣工验收等不同阶段提出了具体的项目质量控制方法。
In the specific implementation process , to prepare for the different stages of the construction project , site construction , and completion and acceptance of the project put forward specific quality control methods .
-
结合房地产开发流程,强调房地产开发企业应重视项目开发决策阶段、设计阶段、竣工验收交付使用阶段的质量管理。
With integrating the procedures of the real estate development , the real estate enterprises should emphasize the quality management of decision , design and completion acceptance application stages , and the function of project inspector in construction stage .
-
随着土地整理实践的开展,目前已有大量项目竣工验收进入运营阶段,这些项目决策是否正确、预期目标和效益是否实现等尚不明确,急需进行后评价。
Along with the development of the land consolidation practice , at present many projects have been checked , approved and come into running . To make sure that the decision-makings of these projects are right and the anticipated aim and effect are realized , the post-evaluation will be needed .
-
本文叙述关于环渤海建材城工程建设投资控制,从工程建设项目实施的投资估算、设计、招标施工、竣工、验收五个阶段做好工作。
In these is , The author will recount the engineering construction investment control about " The city of building materials around Bo hai " . We can do work better from the following five stages : invest estimate , design , invite bids , complete and check before acceptance .