竣工时间

jùn ɡōnɡ shí jiān
  • Time for Completion;time of completion of a project
竣工时间竣工时间
  1. 通过建立卧室三维模型,模拟了室内不同通风情况、室内外温差、室内温度以及装修竣工时间等条件下室内TVOC的时空分布规律。

    By establishing three-dimensional model , distribution regularities of indoor TVOC were simulated in different conditions of ventilation , the difference in indoor and outdoor temperature , indoor temperature and decoration completion time .

  2. 工程竣工时间:2008年8月工程地址:东方广场,面积:2500平米。

    Project completion date : Aug.2008 Project Location : East Plaza , Size : 2500sqm .

  3. 业主可比原目标竣工时间提前5个月将整个链路投入运行;

    The owner was able to bring the whole link into operation five months ahead of its original target completion date .

  4. 若两者的竣工时间相约,在大鸦洲兴建液化天然气接收站的短期优势随即消失。

    If the completion time is actually similar , the short-term advantage of building the LNG terminal at Soko is greatly diminished .

  5. 影响污染物浓度的主要因素为竣工时间、油漆、涂料、复合地板、化纤地毯、人造板用品、增白剂。结论办公室装修对室内空气造成了污染。

    Conclusion Office decoration caused pollution in indoor air and the concentration of indoor air pollutants mainly correlated with completed time , coating material , paints , fiber carpet , artificial board , compound floor , whitening agent .

  6. 对控制工程质量,有效利用资金,保证竣工时间,减少安全事故等方面都起到了举足轻重的作用,已经成为建设工程领域中不可或缺的主角之一。

    To control the engineering quality and save funds and ensure completion time and reduce safety accidents , has played a pivotal role . in the field of construction project has become an indispensable one of leading roles .

  7. 装饰竣工时间越短,皮肤和上呼吸道刺激的发生越高,但眼部刺激症状的最高发生率却出现在装饰后1年以内,1年以上的发生率仍显著地高于对照组。

    The incidence of adverse reaction of skin or upper respiratory tract irritation tend to be reduced with the time fly by in the first year after decoration , however , eye irritation is reported all along , even a year later after decoration ( p < 0.05 ) .

  8. 在整体系统中,竣工的时间到来了。

    This is a time of completion for this entire system .

  9. 建筑工程的竣工比预计的时间要长

    Completion of the building work be take longer than expect

  10. 我们在等待的竣工日期是什么时间?

    What delivery date are we looking at ?

  11. 桥涵工程施工阶段与竣工后一年时间内,破坏的最多,也最严重。

    The bridge and culvert may suffer from serious damage during the construction period and in one year after the completion of the project .