新建渠道

新建渠道新建渠道
  1. 新建渠道沿线渗漏量动态化处理;

    Dynamic simulation of leakage of the newly-built channel ;

  2. 渠道列表是使用本程序的第一个需要操作窗体,设计前需要在这里新建一个渠道名称,之后的工作都是在这一条件限制下进行的,使工程与程序操作一一对应。

    Channel list is the first use of this procedure need to operate form , designed before the need to create a new channel name here , after the work is carried out under such conditions , so that works one correspondence with the program operation .