建设单位

jiàn shè dān wèi
  • project;constructing units
建设单位建设单位
  1. 最后,应用开发出来的仿真程序对实际港口码头项目进行了仿真模拟,通过对模拟结果进行研究和对比分析,提出了合理的营运管理策略,为工程建设单位提供了比较可靠的决策依据。

    Last , the practical project of port is simulated by using the emulator , analyzing the simulation results and putting forward a reasonable port management strategy . It provides a relatively reliable strategic basis for project constructing units .

  2. 工程造价管理不仅仅是个经济问题,它是一集经济、技术与管理为一体的综合学科,工程造价的高低,直接反映着投资效益的好坏,充分体现了建设单位的工作质量和管理水平。

    Project cost management is not only a simple economic problem , but also a complicate subject combining economy , technology and management . The degree of project cost directly reflects the investment yield and sufficiently embodies the quality of work and the degree of management in constructing units .

  3. 建设单位或者个人对责令限期拆除的行政处罚决定不服的,可以在接到责令限期拆除决定之日起十五日内,向人民法院起诉;

    Whereas a construction unit or individual refuse to accept the administrative punishment decisions on dismantling the buildings and other facilities , it may bring the case before the people 's court within 15 days starting from the day when the decision is received .

  4. 第八十三条依照本法规定,责令限期拆除在非法占用的土地上新建的建筑物和其他设施的,建设单位或者个人必须立即停止施工,自行拆除;

    Article 83 Whereas orders have been issued to dismantle the new buildings and other facilities on the land illegally occupied within a prescribed time limit according to the provisions of this law , the construction unit or individual shall stop operation immediately and dismantle them by themselves .

  5. C研究院是从事着军工产业配套的基础设施建设单位。

    C Research Institute is engaged in infrastructure construction of military industries supporting .

  6. 基于PowerBuilder的电力建设单位施工场地可视化管理信息系统的研究与实现

    Study and Implementation of Visualizing Management Information System for a Power Plant Construction Company 's Construction Field Using PowerBuilder

  7. 项目运作模式、组织保障体系是项目风险有效控制和规避的重要环节,本文针对BT投融资项目管理模式进行探讨,对BT投资建设单位所面临的风险因素进行了剖析。

    In section 3 , project operation mode and organization security system control the project risk effectively and are the important evading link . This text carry on discussion to BT investment and financing project management mode , and analyze .

  8. 由于建设单位原因,在施工到层34时,业主建议再加建3层,共14.4m高,办公用途;顶部钢架40m。

    According to the requirement of the unit in charge of the building who asked to add 3 stories and 14.4m high for business use when the construction was in the 34th floor , the top mega-frame of steel is 40m .

  9. 建设单位对工程质量的管理与控制

    Management And Control For the Project Quality By the Constructing Unit

  10. 建设单位应具有业主资格,享有平等待遇。

    Construction unit should have the owner qualification , equal treatment .

  11. 浅谈铁路建设单位工程造价的确定与控制

    On Determination and Control of Railway Project Cost by the Owner

  12. 浅谈铁路建设单位项目投资控制方法

    Simple discussion on the project control method of railway construction unit

  13. 建设单位如何加强工程项目的投资控制

    How to Strengthen Investment Control of the Engineering Project by Owner

  14. 建设单位工程项目管理实务研究

    The practical study on the project item management in build unit

  15. 建设单位在工程质量管理中的位置与作用

    Position and pole of construction division in engineering quality management

  16. 建设单位在建筑工程施工过程中的资料管理

    The construction company 's administration of data during the course of construction

  17. 监理制下建设单位参与工程管理的探讨

    An Approach to Construction Department Participating in Engineering Management Under Supervision System

  18. 现代医用实验室建设单位需求刍议

    Introduction about requirements of construction enterprise to build up modern medical laboratory

  19. 建设单位如何有效地控制工程造价

    How Can the Construction Unit Effectively Control the Construction Cost

  20. 公私合作包括建设单位与政府部门的紧密合作。

    The cooperation include the closer collaboration between owner and government bodies .

  21. 建设单位合同管理系统中的关系及关系规范

    Relationship and Relationship Standard in Contract Management of Building Enterprises

  22. 建设单位如何做好基建管理工作

    How to Make Well Capital Construction Management for Building Units

  23. 建设单位对建设项目造价控制之我见

    My Opinions on the Construction Project Cost Control by the Development Organization

  24. 水利基本建设单位财务管理

    Financial Management of Capital Construction Unit of Water Conservancy Sector

  25. 建设单位有效控制项目投资的要点与方法研究

    Essentials and method study for effectively controlling project investment in construction organizations

  26. 建设单位如何加强对工程造价咨询单位的管理

    On ways to strengthen advisory unit of project costs in architectural enterprise

  27. 建设单位控制工程造价的模式与途径

    The Model and Way of Controlling Project Cost by Investor

  28. 建设单位项目管理中建筑材料认质认价模式探讨

    Discussion of quality and price recognition model in item management

  29. 建设单位变更设计管理办法。

    Administrative measures for altered design prepared by the employer .

  30. 从客观条件、建设单位、建筑市场等方面论述上升的原因。

    Many elements result in the rise in cost of constructional engineering .