代建项目

代建项目代建项目
  1. 探讨了代建项目的公共规制内容、手段。

    The contents and methods of construction-agent projects also were discussed .

  2. 更进一步,基于标杆管理,构建了代建项目管理绩效评价模型。

    Based on benchmarking , management performance appraisal model is established .

  3. 基于代建项目取费现状的代建人激励初探

    Preliminary Research on the Agent Incentive Based on the Status Quo of Agential Cost

  4. 项目所有权配置下代建项目风险分担机制研究

    Research on the Risk Allocation Mechanism of Agent Construction Project Based on Project Ownership Allocation

  5. 探讨了基于项目治理的代建项目成功因素促成路径。

    Study on forcing route of success factors of agent construction project based on project governance .

  6. 在此基础上,利用演化博弈论,对公租房代建项目中核心利益相关者的行为关系进行演化博弈。

    Then analyze the behaviors of the core stakeholders of the public housing by using evolutionary game theory .

  7. 第三部分对风险的管理方式进行了阐述,并基于利益相关方的理论对政府投资代建项目的风险进行了识别及分类。

    In part 3 , interested-party-theory-based identification and classification to the risks in government invested agent-construction projects is proposed .

  8. 在本文最末,提出了公路代建项目风险的控制和防范机制。

    In this article most end , proposed the road generation constructs the project risk the control and the guard mechanism .

  9. 随后,结合寻租与产权的关系,提出了高速公路代建项目新型产权关系以及对寻租的制约。

    Moreover , it has a further discussion on the responsibility-right relation , and the relationship between seek-renting and property right .

  10. 代建项目实施前的风险主要是指选择代建人的风险,这是政府投资主管部门面临的风险。

    The risk before the project construction mainly refers to the risk of choosing the construction-agent sector , which is faced by the government investment department .

  11. 由于代建项目的某些特征,决定了其成功指标和因素的研究所要考虑的不应只局限于一般项目成功指标和因素的框架内。

    Some characteristics of agent construction determine that researches of its success indexes and factors should not be limited to the framework of success indexes and factors of common projects .

  12. 在对河北代建项目管理模式现状进行分析的基础上,探讨了河北实行代建制的适宜模式,并对河北代建项目管理模式提出了具体建议和改进思路。

    Based on the analysis about the actual status of applying project consignment management in Hebei province , the model adopted of the agent-construction system in Hebei province is discussed .

  13. 通过问卷设计的形式,对代建项目的成功因素进行问卷调查,并通过因子分析以及相关分析等数学手段确定了关键的成功因素,对前文理论研究结果的有效性进行了论证。

    This dissertation does research on success factors of agent construction project by questionnaire , determines critical success factors by factor analysis , correlation analysis and demonstrates the research results effectively .

  14. 通过对代建项目的风险因素进行分类识别,依据基于项目所有权配置的风险分担原则及过程模型,设计了初步的风险分担方案。

    Combined with the classification identification of the risk factors in ACP and the POA-based principles of RA , the RA scheme based on those principles and process model was designed .

  15. 为此需要探讨代建项目管理绩效改善的途径,并充分把握管理绩效持续改善过程中绩效评价这一关键环节。

    It is necessary to find ways to improve the management performance of agent construction project and grasp the key point performance appraisal during the process of continuous improvement of management performance .

  16. 借鉴项目管理绩效评价的相关知识,本文站在政府投资人的角度,通过对代建项目利益相关者和影响代建项目绩效的关键因素两方面的分析,建立了代建项目管理绩效评价指标体系。

    Referencing the knowledge relating on performance appraisal of project management , the appraisal index system of management performance of agent construction project is conducted , considering project stakeholders and influence factors of agent construction project .

  17. 其次,利用结构方程模型对所论证的代建项目成功因素与指标之间的关联关系进行了案例研究,从中挖掘出各个因素对不同成功指标的影响关系。

    Secondly , this article studies incidence relations of success indexes and factors of agent construction by use of structural equation model through a case and digs out connections of influence of each factor to each index .

  18. 介绍了代建项目造价管理的背景及目标,论述了代建人对代建项目在工程招标及施工阶段造价管理的主要方法,探讨了代建项目造价管理中存在的主要问题。

    The construction management background and objectives of deputy construction project are introduced . Cost control measures in bidding and construction stages of deputy are discussed . In the end major problems existed in cost management of deputy construction project are summarized .

  19. 通过对代建项目管理绩效的形成机理及评价指标体系构建的原则分析,确定了代建项目管理绩效的指标体系,在此基础上通过标杆管理的方法建立评价模型。

    By analysis of formation mechanism of management performance of agent construction project and building principles of evaluation index system , this dissertation forms the evaluation index system of management performance of agent construction project , based on which builds evaluation model by benchmarking .

  20. 公路工程代建单位项目经理绩效的模糊综合评价

    Fuzzy Comprehensive Evaluation on Project Managers ' Performance of Highway Engineering Agent-construction Unit

  21. 市政公共设施委托代建工程项目管理机制研究

    The Research on the Project Management Mechanism of Municipal Public Establishment 's Agent-construction Projects

  22. 基于全过程委托代建模式的项目管理公司建设问题研究

    Construction of project management companies based on overall process agency construction system

  23. 在此基础上,论文将研究对象界定在政府委托人与代建人之间项目治理层的投资控制问题上。

    On this basis , the paper will focus the study object on the project management level between the government client and the construction agent in the course of investment control .

  24. BC公司主要从事工程建设,作为一家以代建省市重点工程项目为主的国有企业,由于公司抓住国家发展基础设施建设的契机,迅速发展起来。

    BC company mainly engaged in engineering construction , as a state-owned construction-agent enterprise of key engineering project , the company seize the national infrastructure development opportunity , develop rapidly .

  25. 探讨了代建活动中虚拟项目组织的风险管理组织和活动;

    Economics and management theory have been used to analyze the theory base of virtual organization in this dissertation .

  26. 因而保障代建单位建设期项目法人地位是代建制成功实施的关键,而这有赖于相关法律法规的完善。

    So it is highly important to ensure the rights of the agent contractor as the owner in the construction phase , thus , some related laws and regulations need to be amended .

  27. 本文着重介绍代建单位的中标项目如何有效控制投资及如何加强风险管理,旨在为代建单位的投资管理提供参考。

    This text states how to control invest effectively for projects winning a bid which call for bid for the agency of the owner and how to strengthen risk management , aiming at offering reference for the management of the investment of the agency of the owner .

  28. 广东省代建模式下代建项目信息管理探讨

    Discussion about Information Management under Agent-construction Mode in Guangdong Province

  29. 本文围绕对代建单位在代建合同、项目前期及实施阶段存在的风险进行分析,在提高项目效益的前提下,提出了代建单位防范风险的措施。

    This text , analyzing around risks existing in the earlier stage and implementing stage of agency construction management enterprises , in the case of increasing project benefit , put forward the measure against the risk of agency construction management enterprises .

  30. 在工程项目代建制模式下,代建单位作为投资项目的载体与核心,具有对代建项目组织实施的决策权和执行权。

    In the engineering project under the mode of acting system , the construction unit of the investment project as a carrier and the core , has for the construction project organization decision-making power and executive power .