施工进度计划

  • 网络construction scheduling;CONSTRUCTION SCHEDULE;Construction Progress;CAD
施工进度计划施工进度计划
  1. 论文主要内容如下:(1)桥梁施工进度计划的仿真和资源优化。

    The main Contents are summarized as follows : ( 1 ) Research on the bridge construction scheduling simulation and resource optimization .

  2. 施工进度计划柔性网络仿真的不确定性研究

    Uncertainty Analysis for Construction Scheduling with Flexible Network Simulation

  3. 论文中运用了计算机辅助设计(CAD)三维造型技术、智能推理技术,实现了施工进度计划的自动安排。

    The article makes use of computer aided design ( CAD ) technique , intelligent deduction technique to complete construction schedule .

  4. 资源约束下PERT施工进度计划的优化

    Time-resources tradeoffs of PERT construction schedule under resource constraints

  5. P3软件在抽水蓄能电站施工进度计划编制中的应用

    Application of Software P3 to Work out Construction Schedule of A Pumped Storage Power Station

  6. 其次,阐述了本项目所涉及的项目管理的基础知识,对项目组织管理,施工进度计划与控制管理和沟通管理如何在SCADA系统项目的实施过程中的应用进行了探讨。

    Applications of project organization and management , construction plan , control management and communication management are described in the implementation process of SCADA system .

  7. 介绍了P3软件的功能和特点以及在某抽水蓄能电站工程施工进度计划编制中的应用过程及成果。

    The functions and characters of the software P3 and its application to work out the construction schedule of a pumped storage power station are described .

  8. 分析水利水电工程施工进度计划对工程建设动态投资的影响,给出施工进度计划风险的定义,提出施工进度风险计算的MC仿真方法。

    The effect of construction schedule on dynamic investment is analysed . Then , the definition of construction schedule risk is given and the MC simulation method for the schedule risk is proposed .

  9. 在该CPM施工进度计划中,在分枝过程中由资源分配所产生的“资源使用顺序关系”作为软逻辑关系添加到CPM计划中,以便和工艺逻辑关系相区别。

    In this CPM programme , resource-based precedence relationships resulted from the resource assignments are added to a programme during the branching process as soft relationships to distinguish them from technological relationships in a traditional CPM programme .

  10. 采用网络横道图编制施工进度计划

    Working Out Construction Progress Plan by Adopting Network Transverse Lined Diagram

  11. 浅谈用统筹法编制市政道路工程施工进度计划

    Workout civil engineering construction schedule with method planning as a whole

  12. 严格按照制定好的施工进度计划,全方位展开施工。

    Strictly accordance with construction speed schedule and all-round do construction .

  13. 组织技术人员,按施工进度计划组织施工。

    Organize technicians and carry out construction according to the construction schedule .

  14. 异节拍流水施工进度计划的直接绘制法

    Direct rendering method of different beat flow construction procedures planning

  15. 日本建筑业施工进度计划方法简介

    A brief introduction to the working organization plans of Japanese construction industry

  16. 用矩阵法编制施工进度计划

    Compiling the Plan of Construction Progress by Means of Matrix

  17. 浅谈施工进度计划分析与调整

    Simple View on Analysis & Adjustment of Construction Progress Schedule

  18. 最优资金流施工进度计划的风险分析

    Risk analysis of construction schedule with optimum cash flow

  19. 施工进度计划只是一个计划,总存在风险。

    The construction schedule is only a plan , which always has risk .

  20. 不确定环境下局部施工进度计划优化问题研究

    Research of part construction programme optimization on uncertain condition

  21. 水利水电施工进度计划的风险分析

    Risk Analysis of Construction Schedule for Water Resource Projects

  22. 关于单位工程施工进度计划两种表示方式的研究

    Study on Two Forms of Single Project Construction Schedule

  23. 浅析工程项目施工进度计划的编制

    On Method of Working out Schedule of Project Construction

  24. 新工程条件下施工进度计划编制技巧探讨

    A Discussion about the Skills of Construction Programme Design Under the New Engineering Conditions

  25. 基于施工进度计划的动态安全评价模型研究

    Dynamic Safety Evaluating Based on Project Network Schedule

  26. 施工进度计划偏差分析方法的研究

    A study on the method and measure of objective deviation analysis of building progress

  27. 多约束事件下施工进度计划控制技术

    Construction Schedule Control Technology under Multi-restrict Events

  28. 基于一定风险水平的施工进度计划研究

    Scheduling for construction under fixed risk probability

  29. 水电站机电设备安装施工进度计划及优化方法

    The Installation Schedule and Optimization Method for Mechanical and Electrical Equipment of Hydro Power Station

  30. 工程施工进度计划与资源计划

    Construction Schedule and Resource Plan