地下连续墙
- 网络diaphragm;Diaphragm wall;underground diaphragm wall;Slurry wall
-
地下连续墙的静力计算和m值的讨论
Discussions on Static Calculation and Parameter m for Diaphragm Wall
-
本文分析了地下连续墙工程的几项常见质量通病及预防措施。
The common quality failures and preventive measures of diaphragm works are analyzed .
-
GFRP筋地下连续墙的工作性能分析
An Analysis on Service Behavior of Diaphragm Wall Reinforced with GFRP Bars
-
SPR型地下连续墙的施工方法和设备
SPR Diaphragm Walls Construction Method and Equipment
-
基于Morlet小波时间尺度表示的地下连续墙无损检测
Nondestructive detection method for underground continuous wall using time-scale representation of Morlet wavelet
-
1m厚44m深地下连续墙的施工工艺
Construction technology of 44 m deep underground continuous wall with 1 m thickness
-
GFRP筋在超长地下连续墙钢筋笼中的应用及笼体吊装施工的研究
Study on GFRP Rebar Applied to Reinforcement Cage in Super Long Diaphragm Wall and on Hoisting and Placement of Reinforcement Cage
-
厚1m、深36m的地下连续墙一墙二用,既作基坑开挖的挡土与防渗墙,又作结构承重墙。
1m thick and 3.6m deep underground continuous wall is used as both retaining & water-penetration resistance wall and load bearing structure wall .
-
饱和软土地基38m深地下连续墙施工技术
Construction technology of 38m deep underground slurry concrete wall project for saturated soft soil foundation bed
-
本文以大直径的圆形地下连续墙为研究对象,利用ANSYS软件的前处理模块,建立了带环梁和无环梁两类大直形圆形地下连续墙的平面和空间有限元模型。
In this paper , taking large diameter diaphragm wall as an object , plane and space finite element model of circular diaphragm walls which have or not have ring BEAM were established , by using ANSYS software pre-processing module .
-
利用MAT-LAB对试验数据进行回归得到了两种地下连续墙碳化深度预测模型:随时间以及CO2浓度变化的预测模型和随混凝土抗压强度变化的预测模型。
Utilize MATLAB software to regress the carbonation depth prediction models for diaphragm wall up to the carbonation time , carbon dioxide density and carbonation strength .
-
射水法建造薄型混凝土防渗墙,是近10a来才发展并日趋完善的建造地下连续墙的新工法。
Building thin concrete seepage prevention wall by water jetting method is a construction technology developed and gradually perfected in recent 10 years for constructing continuous underground wall .
-
本文用DruckerPrager模型和基于直接约束的接触算法模拟了超深嵌岩地下连续墙支护深基坑开挖全过程。
All thirteen excavation stages of a super deep foundation pit braced by rock-socketed diaphragm wall are simulated in this article using Drucker-Prager soil model and contact algorithm based on direct control method .
-
建造在软土地基中的1号竖井位于上海市中心,采用地下连续墙法施工,直径为28m,深30m,开挖深度为18.7m。
With 28m in diameter and 30m in depth located in the centre area of Shanghai , and was built on soft clay foundation using diaphragming method with excavation depth of 18.7m .
-
用劈裂注浆提高软土地基土体强度,解决了深38m的地下连续墙成槽难题。
The technology used for improving soft soil foundation strength by " filling with mortar through cleavage " solves a difficult question concerning trench construction of 38 m deep diaphragm wall .
-
本文以弹性支承的假想梁法为例,用非线性规划中的混合罚函数法和DFP变尺度法,就地下连续墙的优化设计问题作了初步探讨。
Using the mixed penalty-function methods and DFP scale transformation in nonlinear programming and taking the method of hypothetical elastically supported beam for an example , this paper attempts to describe the optimum design for the diaphragm wall .
-
广州市RJ-1地铁上盖基坑围护结构采用地下连续墙及密排的人工挖孔桩作支护,内设一层混凝土支撑的支护方案。
Underground diaphragm wall and retaining piles with concrete interior support are combined to form the retaining structure of the foundation pit of RJ-1 subway Upper Cover .
-
预应力地下连续墙模拟试验及分析研究
Stimulated Test , Analysis and Study on Prestressed Underground Continuous Walls
-
在沿海石坝上进行地下连续墙成槽施工的体会
Understandings to Diaphragm Retaining Wall Trench Construction on Coastal Stone Dam
-
预制地下连续墙在天津奥林匹克大厦中的应用
Application of Prefabricated Underground Continuous Wall in Tianjin Olympic Mansion Project
-
大型商业广场地下连续墙施工质量控制
Construction quality control of underground continuous wall of large Commercial Square
-
大深度大厚度地下连续墙的应用与施工工艺
Application and Construction Techniques of Great Deep and Thick Diaphragm Wall
-
混凝土地下连续墙结构计算方法及模型研究
Structural Calculation Method and Model Studies for Concrete Underground Continual Wall
-
aequipinnatus的做法。地下连续墙及逆做法在施工中的应用
The engineering application of underground continuous wall and reverse construction technique
-
聚丙烯纤维双掺混凝土在地下连续墙中的应用
Application of Polypropylene Fibre Dual - adding Concrete in Diaphragm Wall
-
广州地铁深基坑嵌岩式地下连续墙施工技术
Rock-embedded Diaphragm Wall Construction Technology for Deep Foundation of Guangzhou Metro
-
在地震波作用下地下连续墙的动力响应
The dynamic responses of the slurry wall subjected to earthquake waves
-
地下连续墙钢筋笼、接头桩吊装技术
Re-bar Cages and Connection Piles Hoisting Technology in Diaphragm Wall Construction
-
地下连续墙水平变形的可靠性验证及优化分析
Horizontal deformation reliability verification in diaphragm wall and its optimal analysis
-
地下连续墙施工对临近建筑物沉降的影响
Effect of Diaphragm Wall Construction on the Settlement of Nearby Buildings