任务时间

  • 网络task time;time on task;MTBCF
任务时间任务时间
  1. 在TamarAvnet和AnneLaureSellier进行的实验中,他们让参与者按时间或待办事项列表来组织项目规划、假日购物、瑜伽等活动,以评估他们在“时钟时间”和“任务时间”下的表现。

    In experiments conducted by Tamar Avnet and Anne-Laure Sellier , they had participants organize different activities — from project planning , holiday shopping , to yoga — by time or to-do list to measure how they performed under " clock time vs " task time . "

  2. 这种方法将试图最小化锚定操作(anchoring)(团队成员在早期注释中表示为“锚定”任务时间)。

    It attempts to minimize anchoring ( early comments by team members that " anchor " a task time by expressing it aloud ) .

  3. 提出了一种改进的残差GM(1,1)模型进行资源性能的预测;同时基于资源性能的预测,结合知识推理,研究了任务时间特性的预测。

    An improved residual error GM ( 1,1 ) model is adopted to predict the resource performance and furthermore prediction of time characteristics of tasks are studied with combination of knowledge reasoning .

  4. 研究中考虑回程及任务时间限制,建立数学模型。

    Backhaul and task due time are considered to establish mathematic model .

  5. 应用三点估计法制定企业订单任务时间和缓冲时间。

    Three-point estimate method is adopted to make the task duration of orders at each node and buffers .

  6. 1990年的一项研究发现,考虑到家庭无法马上适应新环境,公司将40%的外派任务时间都缩短了。

    A 1990 study found that 40 percent of all foreign assignments are cut short , usually because the family fails to adjust .

  7. 他们忘了将临时开销计入预算中。并行计算降低计算密集型计算任务时间开销的有力途径。

    They forgot to figure in occasional expenses in a budget Parallel processing is a powerful way to reduce time cost in computation-intense task .

  8. 在推力超过一定量级、任务时间较长的情况下,泵压式发动机比挤压式发动机具有明显的技术优势。

    For high level thrust requirement and long duration mission , the turbopump-fed rocket engine has more advantages than that of the pressure-fed rocket engine .

  9. 针对运输时间不确定的军械紧急调运问题,将运输时间处理为模糊随机变量,建立在任务时间限制期下的最大可能性路径选择模型以确定调运路径。

    Aiming at the problem of ordnance urgency transport with uncertain delivery time , the paper deals it with the fuzzy variable and establishes a routing-selected model .

  10. 动量轮是卫星姿控系统的关键机电产品,要求在几年甚至十几年的任务时间内始终稳定可靠地工作。

    As one of the most important electromechanical products embedded in the attitude control system of satellite , the Momentum Wheel has the requirement of stable working within many years .

  11. 在虚拟企业环境下,制定基于盟主与合作伙伴协商的项目规划不仅要考虑任务时间与工期的可行性,而且要关注工期费用。

    To formulate a project scheduling between coordinator and negotiating partners in virtual enterprise , not only factors such as project completion time and feasibility , but also project expense , should be considered .

  12. 结果表明利用数个‘长寿’的‘小子样、零失效’工作时间试验样本,可以获得高置信度下系统任务时间可靠度的较大下限;

    The results indicate that the lower credible bounds of system 's mission time reliability in high conference level can be calculated based on several ' small and zero failure samples ' in ' long life ' .

  13. 运用军事运筹学和不确定性优化理论,充分考虑节点冲突性、车辆隐蔽性、任务时间、道路容量等因素,建立了运输任务方案的优化模型。

    In the paper , the factors of node conflict , vehicle hiding , task time limitation and road capacity are considered . An optimization model of transport scheme is built based on military operations and uncertain programming theory .

  14. 多任务协作时间调度算法的应用,有效地最小化了系统的额外代价,实现了多Agent系统的优化。

    Application of the proposed algorithm has implemented the optimization of multi-agent system .

  15. 最终的后果往往是Web发布者往往要在反垃圾信息方面浪费大量资源,并会占用处理其他任务的时间。

    And the final injury is that Web publishers end up wasting resources on spam-fighting , taking time way from other tasks .

  16. 调度(Scheduling)研究的问题是将有限的资源实行任务的时间分配,以实现某性能指标最优。

    The problems of research on Scheduling are task time assignment of limited resource , in order to achieve some objective .

  17. 请参考RationalSOMA以进一步了解说明这些任务的时间顺序的详细工作流。

    See Rational SOMA for further detailed workflows that illustrate the time ordering of those tasks .

  18. 我们将学习如何设置MEL脚本,以减少重复的任务的时间。

    We 'll learn how to set up Mel scripts to cut down time on repetitive tasks .

  19. PowerHA不执行备份等管理任务、时间同步和任何与应用程序相关的配置。

    PowerHA does not perform some administrative tasks like backups , time synchronization , and any application specific configuration .

  20. 为了有效处理CPU负载变化及控制任务执行时间不确定等问题,我们提出了一种基于模糊逻辑的能量觉察反馈调度方法。

    In order to effectively deal with the change of CPU workload and uncertain execution time of the control tasks , a feedback scheduling technique based on fuzzy logic for power-aware systems is designed .

  21. 这是因为,截止日期与布置任务的时间在同一年,所以看起来更接近现在,在芝加哥大学布斯商学院(UniversityofChicagoBoothSchoolofBusiness)攻读博士学位的涂艳苹说。

    That 's because the deadline was in the same year as the assignment and therefore seemed more like the present , said Yanping Tu , a Ph.D. candidate at the Booth School of Business at the University of Chicago .

  22. 通过对改进蚁群算法,基本蚁群算法和min-min调度算法进行实验对比,发现本文提出的算法能够有效地缩短网格的任务完成时间跨度,改善网格的负载均衡情况。

    Through experimental comparison in improved ant colony algorithm , basic ant colony algorithm and min-min scheduling algorithm , we found the algorithm proposed can effectively shorten the grid task completion time span and improve the load balancing of grid .

  23. 改进的基于抢占阈值调度的任务响应时间分析方法

    Improved Response Time Analysis Method for Scheduling Tasks with Preemption Threshold

  24. 风险决策任务中时间距离对框架效应的影响

    Influences of Temporal Distance on the Framing Effect in Risky-choice Tasks

  25. 基于负载的任务运行时间预报模型

    Prediction Model of the Running Time of Tasks Based on Load

  26. 装配生产线任务完成时间延迟的响应策略

    The Response Strategies of Task Completion Delay in Assembly Line

  27. 为了一项任务投入时间,努力等。

    Devote ( time , effort , etc. ) to a task .

  28. 你的得分将要根据你完成任务的时间和任务的难度来评比。

    The number of points depends on your quickness and game level .

  29. 软数控实时任务的时间特性对加工精度的影响

    Effect of Time Characteristics of Software NC Real-Time Tasks on Manufacturing Accuracy

  30. 任务完成时间延迟对生产调度结果的影响

    Influence of task completion time for production scheduling results