三门峡水利枢纽

  • 网络Sanmenxia Water Control Project
三门峡水利枢纽三门峡水利枢纽
  1. 三门峡水利枢纽底孔应力试验分析

    Stress test analysis and treatment of the bottom outlet for the Sanmenxia Hydroproject

  2. 三门峡水利枢纽汛期发电的泥沙调节

    Sediment Regulation of Power Generation in flood Seasons at Sanmenxia Hydraulic Key Project

  3. 三门峡水利枢纽建设的经验与教训

    Experiences and lessons of the Sanmenxia Hydroproject Construction

  4. 三门峡水利枢纽底孔破坏机理及改建措施研究

    Studies on destroying mechanism and Reconstruction measures of bottom outlet in Sanmenxia hydro project

  5. 三门峡水利枢纽后评价以国民经济评价和财务评价为主,兼顾影响评价、工程评价和工程管理评价。

    The remarks on it have been made mainly in terms of national economy and financing , and its effect , engineering and engineering management as well .

  6. 本文结合上述各个方面,针对三门峡水利枢纽,以枢纽历史及实时数据为基础,采用可视化的编程技术,建立综合性水利枢纽管理系统,对枢纽的主要功能实现了数字化管理。

    Taking one thing with another above , paper establishes an optimization dispatch and integrative management for Sanmenxia hydro-project based on the data of history and real-time , which can realize digital management at last .