项目组织

  • 网络Project organization;projectized organization;Organisation
项目组织项目组织
  1. UML在PDM项目组织流程中的应用

    The Application of UML in the Flow about Project Organization of PDM

  2. 基于PDM的项目组织结构的实现

    Implementation of project organization structure based on PDM

  3. 如果这个项目组织利用UML来建模,那么单元测试将需要序列图,类图,可能还会需要活动图。

    If the project organization is using UML for modeling , unit testers will need sequence diagrams , class diagrams , and perhaps activity diagrams .

  4. 在分析建设项目组织协同管理的基础上,拟运用多Agent技术来对项目管理各相关阶段的组织协同管理进行建模及算法实现。

    This paper analyzes the collaborative management of construction projects , and describes the use of multi agent technique in the modeling and algorithm realization of the collaborative management for different phases of projects .

  5. CCSD项目组织管理模式研究

    Study on the Project Management Mode of CCSD

  6. 作为节目的一部分,australiangold为洛杉矶艾滋病项目组织(aidsprojectlosangeles)获胜团队选择的慈善组织捐款,让观众对该品牌又产生了一层好感。

    As a part of the show , Australian gold sponsored AIDS Project Los Angeles ( the charity of choice of the winning team ) , creating further viewer goodwill toward the brand .

  7. 结果表明:项目组织成员素质、ERP项目预算、企业管理基础、ERP项目实施是ERP实施绩效的显著影响因素,而项目组织成员素质则是根本影响因素;

    Results reveal that project organization members ' capability , management foundation , ERP project budget have significant positive effect on ERP implementation performance , of which project organization members ' capability is principal predominant factor ;

  8. IBMODMRuleDesigner和DecisionCenter组件方便了业务规则词汇表和语法、业务对象模型(BOM)、规则项目组织和实际业务规则的创建。

    The IBM ODM Rule Designer and Decision Center components facilitate creation of the business rule vocabulary and grammar , the Business Object Model ( BOM ), the rule project organization , and the actual business rules .

  9. 研究方法:采用产吕数据的管理(PDM)对道岔产品研发设计的项目组织、计划进度、文档数据等进行统一集中管理。

    Research methods : The centred management was carried out for project organization , plan progress and file data in cause of research and development of switch products by adopting products data management .

  10. 对EPC总承包的组织管理体系进行研究,从理论演进、国内外企业组织机构构建、EPC项目组织模式等方面进行了阐述,并进行了详尽的分析。

    The organization of EPC contract management system are studied , the theory of evolution , organization building of domestic and foreign enterprise and project organization mode were expounded and made a detailed .

  11. 因此,对CCSD的项目组织管理模式进行系统的研究,以期总结CCSD所获得的项目组织管理经验和完善其项目管理,具有十分重要的现实意义。

    So it is very realistic to make a systemic study on the management mode of CCSD and conclude its project management experiences .

  12. 在去年12月的哈瓦那电影节期间,圣丹斯学院(SundanceInstitute)长片项目组织了一个由演员、导演和编剧组成的代表团,开办了以剧本创作、制片、纪录片剪辑和电影配乐为主题的研讨班。

    During Havana 's film festival in December , a delegation of actors , directors and writers organized by the Sundance Institute 's feature film program offered workshops on screenwriting , production , documentary editing and scoring for film .

  13. 重点分析了项目组织风险管理,分别从组织结构形式设计、组织制度和组织管理创新、基于SNA的组织风险管理以及基于CAS理论的项目组织管理等几个方面提出了降低组织风险的对策。

    Analysing the project risk management organization , respectively from the structure design , system and organizational management innovation , risk management organization based on the SNA and on CAS theory of project management and so on to put forward countermeasures of reducing the risk of organization risk management .

  14. 实例分析结果表明:在利益均沾理念与统筹公平效率的原则下,基于Shapley值法与投入风险因子的组合修正模型对于巨项目组织联盟的利益分配是公平合理的。

    Example results show that : in the concept of equitable distribution of benefits and under the principle of fairness and efficiency , based on shapley value method and risking factor combination method , the modified model is fair and reasonable to the distribution of benefits .

  15. 提出了ePMS的实施需要成立ePMS项目组织机构、制订实施计划并进行调研与咨询,且ePMS实施过程中必须注意风险控制,同时必须对管理和业务进行必要的业务流程重组。

    The implementation of ePMS requires establishing project organizations , drawing implementing programs and carrying out investigations and consultations . In the course of implementing ePMS , it is necessary to control the risk level and necessarily reorganize the business flow .

  16. 基于并行工程的地铁项目组织模式研究

    Research on Organizational Mode of Subway Engineering Based on Concurrent Engineering

  17. 基因组方法在项目组织结构优化中应用

    Application of the Genome Method to Optimize the Organization Structure

  18. 社会技术系统理论及其在项目组织设计中的应用

    Sociotechnical System Theory and Its Application in the Organizational Design of Project

  19. 东北地区成品油配送项目组织与实施

    Project Organization and Implementation of Distribution of Refined Oil in Northeast Area

  20. 确定项目组织分解结构和编码;

    Determine project organization decompose structure and its number ;

  21. 大型工程项目组织结构研究

    Study on the Organizational Structure of Large-scale Construction Project

  22. 建立以质量为导向的项目组织文化等。

    Create a quality-oriented projects and organizational culture .

  23. 项目组织结构选择是否合理将直接关系到项目的运行效率。

    Rational selecting of project organization structure directly related to the success of project .

  24. 大型建设项目组织设计研究

    Research on organization design of large construction project

  25. 重大工程前期研究项目组织与管理初探

    Organization and Management of Major Projects in FEED

  26. 九五重大、重点项目组织工作之我见

    My opinion of the organization of major and key projects of the 9th Five-Year Plan

  27. 第四,以建立相应风险管理机制来实现风险管理模型的应用,并分人力资源、项目组织架构讨论管理环境对风险管理的支持。

    Fourthly , the mechanism of risk management is established to realize the application of risk management .

  28. 并阐述了虚拟项目组织协调管理及其支持环境。

    Furthermore , the harmonization management and its support environment of the virtual project organization are described .

  29. 基于建设项目组织创新和交易成本理论,对项目管理模式的演变和Partenring模式进行了分析。

    Based on the two latitudes and transaction cost theory , project management mode and Partnering are analyzed .

  30. 由项目组织结构可知,业主对社会化力量管理是否有效直接关系到整个项目的管理绩效。

    It is known that the effectiveness of the owners'management on specialization enterprises is critical on project performance .