青铜峡站

青铜峡站青铜峡站
  1. PLC在青铜峡水电站~9机监控系统中的实际应用

    The practical application of PLC in No.9 hydroelectric generator unit control system of Qingtongxia Hydropower Station

  2. 对青铜峡水电站110kV主变故障处理后试验结果异常进行分析,并根据分析结果对设备进行绝缘干燥处理。

    Analyzes the abnormal test results of 110 kV main transformer after the failure treated in Qingtongxia Hydroelectric Station , according to the analysis results , treats the equipment with insulating and drying methods .

  3. 青铜峡水电站半门式起重机三维有限元分析

    3D Finite Element Analysis of Semi-portal Crane at Qingtong Gorge Hydropower Station

  4. 青铜峡水电站闸门安全检测与结构强度复核

    Safety testing and structural strength recheck of hydraulic gates of Qingtongxia Hydropower Station

  5. 青铜峡水电站~3主变绝缘干燥的分析和处理

    Analysis and treatment for insulation and dry of No.3 main transformer in Qingtongxia Hydroelectric Station

  6. 青铜峡水电站河西导墙变位计监测数据计算方法

    Calculating Method for Monitoring Data from Hexi Guide Wall Displacement Meters in Qingtongxia Hydropower Station

  7. 青铜峡水电站~5机转轮吊装方式改造

    The improvement of hoisting mode for # 5 hydraulic turbine unit in Qingtongxia Hydropower Plant

  8. 青铜峡水电站励磁系统的现状及技改方向

    The status quo and technological improving direction of excitation system in Qingtongxia Hydroelectric Power Station

  9. 从弹性金属塑料瓦与钨金瓦相关参数的比较、加工工艺等方面,论述了弹性金属塑料瓦在青铜峡水电站水导轴承中的应用效果及其应注意的问题。

    By comparing the related parameter and machining technics of elastic metallic plastic tile and tungalloy tile , describes the applying effects and the concerned noticing and improving problems of elastic metallic plastic tile in hydraulic turbine bearing of Qingtongxia Hydroelectric Station .