施工现场

  • Construction site;【化】job location
施工现场施工现场
  1. 在采用何种制度才能确实起作用方面,本文结合施工现场广泛做法,分析了项目经济承包责任制。

    We analyze the project economical contract liability mechanism that widely used on construction scene in order to answer the question of which mechanism is available .

  2. 基于AHP的建筑施工现场安全评价模型研究

    A study on safety assessment model of construction site based on AHP

  3. 介绍了施工现场的工程概况及螺栓球节点网架的施工工艺和施工方法,并收到了良好效果。NET技术的解决方案。

    The engineering survey and construction process and method of bolted ball joint net frame are introduced , and good result has been achieved .

  4. 赛科项目施工现场HSE管理

    HSE Management of SECCO Project under Construction at site

  5. 除城镇路段少数几个信标外,设计顾问单位所建的gps信标不得位于施工现场或报告中示踪位置。

    The GPS beacons established by design consultants could not be located either at site or traced in reports except a few beacons in town sections .

  6. 土压平衡(EPB)盾构隧道工程信息化施工现场监测技术;

    Field information construction monitoring technology of EPB shield tunnel ;

  7. 浅谈高速公路项目施工现场5S管理

    Discussions on the " 5S " Management of Construction Worksites in the Project of Highways

  8. 利用大体积混凝土变形荷载作用下数值分析程序MASSIVE及施工现场监测系统,对新上海国际大厦基础承压平台的混凝土水化热的影响进行了理论分析和施工现场监测。

    Affection of hydration heat of mixture concrete during construction to mass concrete foundation of New Shanghai Intemational Tower is analysed theoretically and taken measure of surveillance in site , with numerical analysis program MASSIVE and monitor control system .

  9. 施工现场TN-S保护接零

    The TN-S protective zero terminating in construction site

  10. 根据水力压裂施工现场控制特点,提出了两种实用的智能化控制算法:位置式PID控制算法和增量式PID控制算法,描述了算法原理和软件实现。

    According to the traits of the field control of the hydraulic fracturing operation , several intelligent control algorithms , such as position PID algorithm and incremental PID algorithm are put forward and the algorithm principle and the software implementation are described .

  11. 在三峡大坝施工现场,用坝体混凝土制做了6m×2m×10m的大体积混凝土模型,内置各种混凝土缺陷,对其开展面波探测可行性研究。

    The concrete model made in a dimension 6 m by 2 m by 10 m with different flaws was used for researching the feasibility and practicality of surface wave in concrete flaws detection .

  12. 为利用高密度电阻率法检测混凝土缺陷,在三峡大坝施工现场,用坝体混凝土制成6m×2m×10m的大体积混凝土模型,模型内置各种混凝土质量缺陷。

    For adopting high density resistivity method to detect defects of concrete , a physical model dimensioning 6 m × 2 m × 10 m and containing diverse defects was fabricated in the construction site of the Three Gorges Project .

  13. 为贯彻安全生产方针,确保施工现场用电安全,对TN-S系统和TT系统两种接地型式进行了研究;

    In order to carry out the policy of safe production , guarantee the power consuming security in construction site , research on two earth patterns of TN-S system and TT system has been carried on .

  14. 最后简述了半自动熔化极水喷射水下电弧切割新技术在深海60m施工现场进行切割的情况。切割速度达到20m/h以上。

    The last part of the paper is a brief account of a successful cutting on site at a depth of 60 metres under water , employing the new consumable electrode water jet technique with a cutting speed up to 20m / h and more .

  15. 根据JGJ4688施工现场临时用电安全技术规范,说明了施工现场保护接零的选用原则。

    According to JGJ4688 the safety technique codes of temporary using electricity in construction site the paper illustrates the choose principle of protective zero terminating in construction site .

  16. 建筑施工现场安全监督管理的探讨

    A discussion on the safety supervision and management at construction site

  17. 施工现场临时用电的管理

    The Management of the Temporary Power Use in the Construction Site

  18. 施工现场群塔的合理布置与管理

    Reasonable Arrangement and Management of Group Tower Cranes on Building Site

  19. 当前施工现场留置砂浆、混凝土试件存在的问题

    Problem of Remaining Mortar & Concrete Testing Piece on Construction Site

  20. 陡坡地段公路桥梁桩基施工现场监测与性状分析

    Analyses and Monitoring of Highway Bridge Piles Constructed on Steep Slopes

  21. 公路工程施工现场管理应注意的问题

    Attention a Few Problems in Scene of Administration in Road Engineering Construction

  22. 建筑施工现场安全警示标志通病及防治措施

    Problems and preventive measures concerning the warning signs on the construction site

  23. 关于施工现场混凝土试件几个问题的探讨

    Probe into Several Problems of the Concrete Specimens in the Construction Site

  24. 谈施工现场临时用电的接零保护系统

    On the Zero Connection Protection System of Temporary Electricity in Construction Site

  25. 公路施工现场污水处理对策研究

    Study on Countermeasures of Sewage Disposal at Highway Construction Scene

  26. 对施工现场组织管理中经济效益的思考

    On the Economic Benefit in Organization Management of Construction Site

  27. 现代工程建设施工现场定置设计与管理

    A locating design and management of modern engineering at a job site

  28. 施工现场对工程材料的质量和成本控制

    Quality and cost control of engineering materials in construction spot

  29. 浅谈常规建筑材料施工现场如何取样

    Brief Talk about How to Sample Conventional Building Material at Construction Site

  30. 公路桥梁施工现场临时用电施工组织设计

    Temporary Power Construction Design of Road and Bridge Construction Site