基本建设程序

jī běn jiàn shè chénɡ xù
  • capital construction procedure
基本建设程序基本建设程序
  1. 电力基本建设程序和前期工作

    Capital Construction Procedure and It 's Previous Work for Electric Power Industry

  2. 前期阶段在基本建设程序中的地位

    Status of Preliminary Stage in Capital Construction Procedure

  3. 《规划》中涉及的建设项目,按照基本建设程序审批。

    The construction projects involved in the Planning shall be examined and approved pursuant to the procedures for infrastructures .

  4. 需严格遵守国家基本建设程序和有关法规、方针、政策,才能解决造价管理中的问题。

    Strict stand by country basically construct program and relate law , policy and guideline can be solve the problem in cost management .

  5. 第二十二条兴建水工程,必须遵守国家规定的基本建设程序和其他有关规定。

    Article 22 : For all water projects , capital construction procedures stipulated by the State and other relevant provisions must be observed .

  6. 项目后评价是基本建设程序的重要组成部分,是管理周期中不可缺少的信息反馈环节。

    Project post-assessment is an important constituent of the basic construction procedure , and it is an essential information feedback link of the management cycle .

  7. 轨道交通建设计划按照国家和本市规定的基本建设程序批准后组织实施。

    The CRC construction plan shall be organized and carried out after approval according to the procedure of capital construction set by the State and this Municipality .

  8. 根据我国基本建设程序,我国项目评估可分为立项评估、中期评估和后评估。

    According to the capital construction procedure of China , project evaluation can be divided into the approval evaluation for construction , middle evaluation and post evaluation .

  9. 摘要后评价是水利基本建设程序的重要组成部分和最后环节,是固定资产投资管理的一项重要内容。

    Post assessment is an important component and the last link of the capital construction procedure , and also an important part of the fixed assets investment management .

  10. 造林规划设计是林业生态工程基本建设程序中不可缺少的最重要环节,造林工程管理也直接关系到林业工程的生态、社会、经济三大效益的发挥。

    Silviculture planning and design is the most indispensable and important link in forestry ecological projects , forestry project management has direct relation on ecological social economic benefit of these projects .

  11. 本文通过对比中西方高速公路工程可行性研究工作,从研究的内容、对可行性研究工作的管理以及可行性研究在基本建设程序中的地位等方面进行了详细的分析,找出了差异所在。

    In this paper , the anthor make a comparison between the West and Chinese feasibility study from the contents and the management on the feasibility studies , finding the differences .

  12. 合理确定有效控制造价,必须按基本建设程序办事,以设计为重点进行全过程的造价控制和科学管理。

    In must be follow basis construction program if want to logical confirm effective control cost , base on design as key point take full process cost control and science management .

  13. 通过对项目超概原因的分析,从严格按基本建设程序办事,以设计为重点进行控制工程造价等方面,阐述了控制工程造价的主要措施,并对完善造价管理体系提出了一些思路。

    This paper analyzes the reasons caused over-budget estimation and from normalizing program , cost control and other aspects proposed some cost control measures as well as some ideas to perfect cost control system .

  14. 并结合现行公路基本建设程序存在的问题和薄弱环节,对基于公路基本建设程序的公路基本建设及其政府监管问题进行了具体分析。

    Combined with the problems of existing highway infrastructure program and the impact on highway infrastructure program after implementing the " construction-agent system ", this paper analyzes concretely the whole construction and the government regulation of the highway infrastructure program .

  15. 本文立题的意义在于按照国家基本建设程序要求,通过对项目进行必要性和可行性研究,为科学决策、避免盲目投资奠定必要的基础,提供依据和参考。

    The purpose of the project is to found necessary base and provide proof and reference for scientific decision to avoid blind investment , on the basis of state infrastructure procedure and the necessity and feasibility study on the project .

  16. 主要根据宜春钽铌矿生产建设的实践,论述我国矿山企业在基本建设程序、矿山设计和生产经营的科学管理等方面的经验与教训。

    Taking the practice of construction of Yichun Tantalum-niobium Ore Mine for example , the experiences and lessons in respects of construction sequence , mine design , scientific management of operation are explained that should be taken by other mines to be constructed .

  17. 建设项目可行性研究报告按照国家规定的基本建设程序报请批准时,应当附具有关水行政主管部门审查批准的洪水影响评价报告。

    When submitted for approval according to the procedures set by the state for capital construction , the feasibility study report of the construction project should include the flood impact assessment report having been examined and approved by the relevant water conservancy administrative department .

  18. 后评价是水利工程基本建设的重要程序

    Post-evaluation & An Important Procedure in Fundamental Construction of Water Conservancy Projects