负荷计划

负荷计划负荷计划
  1. 用服务器推(Push)技术实现发电厂负荷计划管理

    Implement the Management of Power Plant Load Plan by Using Server PUSH - technology

  2. 通过求解模型获得电站内各台机组在给定日负荷计划下的最佳负荷运行分配方案。

    The optimal load distribution scheme for the operation of each unit was obtained under the planned daily load .

  3. 最大日负荷总量计划在非点源污染控制管理中的应用

    Application of total maximum daily load ( TMDL ) program to control of non-point source pollution

  4. 在一个典型的数据中心环境中,您必须根据最大负荷做计划,因此IT资源通常并未充分利用。

    In a typical data center environment , you must plan for peak loads , so IT resources are frequently underutilized .

  5. 事实证明超负荷的计划活动不仅仅表现为对家长的刻薄,对孩子也是不好的。

    Turns out the overload of planned activities isn 't just hard on the parents , it 's not good for kids , either .

  6. 在这种模式下得到的日负荷机组分配计划满足了电力电量平衡,同时也取得了节能减排的效果。

    In this mode , it is received by daily load distribution plan to meet the power unit power balance , on the other hand has also made energy-saving emission reduction results .

  7. 通过工艺信息获得完成该条计划的资源和设备类型,计算该型设备的现有负荷,将计划指定到负荷最小设备上。

    The resource and machine types for the plan was gotten through the process information , and the existing load of the machine type was computed , the production-plan was assigned to the machine whose load is the lowest .

  8. 为此,针对负荷预测和发电计划的应用,从管理和技术角度提出了水、火电协调的AGC控制方式。

    In accordance with the application of load forecasting and generation scheduling , and from the aspects of management and technology , this paper puts forward an AGC control mode coordinating hydro and thermal power generation .

  9. 该方法考虑发电-负荷平衡和检修计划,并对合同电量作滚动处理,可作为设计电力市场技术支持系统合同管理部分的参考。

    It can be looked as a reference when designing contract manage - ment system in deregulated power market .

  10. 提出了实施经济调度方案中的负荷预计和供电计划、发电调度计划、调度的执行、考核与结算的方法。

    For the economical dispatch scheme , it proposes the load prediction , power supply plan , generation dispatching plan , dispatching execution , assessment and account settling method .

  11. 借鉴漏斗模型和最优生产技术(optimizedproductiontechnology,OPT)的思想,提出了引入能力负荷状况,提前期的设置与能力负荷计划同时产生的MRP改进模式。

    According to the funnel model and the OPT ( Optimized Production Technology ) theory , a description of improved MRP model was given . The lead time setup and the capacity load plan were made simultaneously in this model .

  12. 在电力市场环境下,由于负荷需求弹性的存在,面对电价的波动,用户可适时调整负荷计划,改变实际负荷曲线,从而直接影响发电系统可靠性的计算。

    Under the power market environment , facing the fluctuation of market clearing price and load demand elasticity , the users may adjust the load plan at the right moment which can change the actual load curve and affect the generation system reliability calculation .

  13. 为了掌握和调控运动负荷,保证大赛中保持良好的竞技状态,我们根据本院男子足球代表队运动员的特点设计了一套有球大负荷训练的计划,选择五项指标来监测训练的效果。

    For controlling sports load and maintaining good form in match , The authors designed a set of plan of high work load training with balls and selected five monitoring target to monitor training effect according to the characteristic of our sportsmen .