竖井

shù jǐng
  • shaft;vertical shaft;silo;mineshaft;aven;cenote;pothole
竖井竖井
竖井 [shù jǐng]
  • (1) [vertical shaft]

  • (2) 开采矿石中通达矿床的竖直的通道,为提升矿物、运送人员和材料、通风等用

  • (3) 穿过建筑物各层楼的垂直的开口或通道

  • 通风竖井

竖井[shù jǐng]
  1. 主竖井钢罐道更换施工方案选择与实施

    The Selection and Carrying out on Changing Practice Scheme of Main Pothole Steel Tin

  2. 用于集中管理竖井式的构建或发布过程的基于Web的控制台,以及简化的用户管理

    A Web-based console for centralized management of silo 'd build / release processes , as well as simplified user administration

  3. 暗井是隧道内的下沉竖井。

    A shaft sunk inside a tunnel is called a winze .

  4. 它由竖井、暗渠、明渠和涝坝(一种小型蓄水池)四部分组成。

    It consists of shafts , culverts , channel and flood dam ( a small reservoir ) composed of four parts .

  5. 竖井已经打下,并且挖有横向矿道

    Shafts were sunk , with tunnels dug laterally .

  6. AUTOCAD在竖井设备布置中的应用

    Auto CAD 's Application in the Field of Shaft Facility Arrangement

  7. EVENT数据竖井包含公共基础事件基础结构的数据。

    The EVENT silo data silo contains the data of the Common Base Event Infrastructure .

  8. 竖井提升PC信号系统

    The PC signal system for mine hoist

  9. V型尾门在河工模型试验中的应用竖井孔口式泄洪洞恒定及非恒定泄流特性探讨

    The application of the V-typed tailgate in unsteady flow hydraulic model The Hydraulic and Unsteady Discharging Characteristics of Shaft Aperture Inlet

  10. 顾名思义,竖井应用程序的原则和实现不能直接应用到SOA。

    The principles of silo applications , namely inception , design , and implementation , cannot be directly applied to SOA .

  11. 当企业开始采用SOA时,从竖井开发进行范式转换并未得到良好的制度化。

    When an enterprise begins to embrace SOA , often the paradigm shift away from silo development is not well institutionalized .

  12. 一方面,服务本身是迷你型应用;而另一方面,SOA的整体目标是打破应用竖井&数据和自动化的孤岛。

    On one hand services themselves are mini applications ; on another hand , the whole purpose of SOA was to break applications silos – islands of data and automation .

  13. 传统的电话系统或IP网络描述为竖井(silo)结构,由与网络设备提供商(NetworkEquipmentProviders,NEP)硬件紧密偶合的专用黑盒解决方案组成。

    The traditional telephony system or IP network is depicted as a silo structure , which is comprised of proprietary black box solutions closely coupled with Network Equipment Providers ( NEP ) hardware .

  14. 由于采用竖井(silo)方法会导致服务被多次标识和实现,不必要的昂贵开发成本或服务重复使得采用SOA所能带来的好处大打折扣。

    Since services are identified and implemented multiple times as a result of the silo approach , costly development of unnecessary or duplicate services negates the benefits promised from adopting SOA .

  15. 总的说来,传统的开发与应用程序竖井(Silo)一致,实现的是紧密耦合,其结构使用组件和对象作为构建块。

    Traditional development , in general , is aligned to application silos , is tightly coupled , and is structured using components and objects as building blocks .

  16. 不过,SOA允许企业将其技术工作的重点放在将支持其业务功能或流程的服务上例如,能够与业务任务对应的服务操作而不是基于竖井(silo)式信息体系的服务。

    SOA , however , allows businesses to focus their technology efforts on services that will support their business capabilities or processes for example , service operations can correspond to business tasks as opposed to services based on siloed information systems .

  17. EGL被设计成平台无关的,这可以使公司捣毁开发竖井并利用需要运行应用程序的最为适合的平台。

    EGL has been designed to be platform neutral , which enables companies to break down development silos and exploit whatever platform is most appropriate for the application that needs to be run .

  18. 该标记集应该独立于任何信息竖井(silo)或Web2.0应用程序进行维护,也就是可以添加新标记、删除标记,并且可以重命名标记。

    This set of tags should be maintained independent of any of the information silos or Web2.0 applications , that is new tags can be added , tags can be deleted , and tags can be renamed .

  19. 从溜管(槽)在南六竖井的应用情况看,在垂直运输高度为30m的情况下,很容易发生骨料分离现象,对混凝土质量有较大的影响。

    From the practical condition of the No. 6 shaft well , under the condition of more than 30 m vertical transportation height , the concrete aggregate separation occurred easily and considerably influenced concrete quality .

  20. 建造在软土地基中的1号竖井位于上海市中心,采用地下连续墙法施工,直径为28m,深30m,开挖深度为18.7m。

    With 28m in diameter and 30m in depth located in the centre area of Shanghai , and was built on soft clay foundation using diaphragming method with excavation depth of 18.7m .

  21. 成功实现了在这种复杂结构中突水水灾蔓延模拟过程。第三,选取了一个简单的竖井结构,通过对格子Boltzmann演化方程的变换推导,找到了一种可以适用于外力项的演化方程。

    Success achieved in this complex structure of flood spread simulation process of water . Third , the selection of a simple shaft structure , through the lattice Boltzmann evolution equation deduced the transformation , have found a way suitable for external force item evolution equation .

  22. 在Rosenbluth两点概率估计方法的基础上,进一步研究了更为精确的多点概率估计法在竖井地基固结概率分析中的应用。

    Based on Rosenbluth 's 2-point estimate method , further research is done on the application of multi-point estimate method , which is more accurate in the probablity analysis of the vertical drain ground consolidation .

  23. 此外,该数据竖井还包含失败事件数据。

    Furthermore , the data silo contains the Failed Event data .

  24. 金川某竖井地基工程地质评价方法

    Method of engineering geological evaluation for certain shaft , foundation Jinchuan

  25. 珠钢150吨电炉竖井手指阀弹簧失效的探讨

    Discussion of Zhujiang 150 tons furnace shaft finger 's spring failure

  26. 竖井的玻璃钢复合材料井筒装备

    On Equipments with Fiberglass Reinforced Plastic Complex Material of Vertical Shaft

  27. 竖井定向联系测量新方法的应用研究

    An Application Study of New Method for Vertical-shaft Orientation Connected Surveying

  28. 过江外排顶管工程工作竖井定位及其精度的研究

    Positioning and Accuracy Analysis of the Working Shaft for a Project

  29. 水泥锚杆卷在竖井罐道梁安装中的应用

    An Application of Cement Bolt Spool in Installation of Cageway Girder

  30. 矿山竖井工程地质勘察孔的施工体会

    Understanding of the construction of mining shaft engineering geological investigation boring