洪家渡水电站

  • 网络hongjiadu hydropower station
洪家渡水电站洪家渡水电站
  1. 洪家渡水电站是乌江梯级的龙头电站,其对下游的补偿效益大于本身效益。

    Hongjiadu Hydropower Station , as the first stage of cascade stations developed on Wujiang River , will have greater compensation benefit to thte stations located on its downstream reach than itself .

  2. 乌江洪家渡水电站主体工程的监理招标严格按国家招标法进行。

    Tendering for supervision engineers in main civil projects of Hongjiadu Hydropower Station was strictly followed the state tendering and bidding law .

  3. 洪家渡水电站洞式溢洪道的断面尺寸为14。

    The section size of the tunnel-spillway of is14 .

  4. 洪家渡水电站是贵州省乌江梯级开发的一个龙头电站。

    Hongjia Ferry hydropower station is a tap station of wujiang River step exploitation in Guizhou province .

  5. 洪家渡水电站泄洪隧洞的设计优化,经多种设计方案的比较论证,优选出适宜于该洞自然条件和运行要求的方案三。

    There are two methods namely flood discharge tunnel and spillway selected and compared for flood discharge structure of the Hengquan Reservoir Project .

  6. 简要介绍了洪家渡水电站混凝土面板堆石坝面板接缝止水的结构形式、施工方法及施工工艺。

    A brief introduction is made on the structure of slab joint seal for the concrete slab rockfill dam of Hongjiadu hydropower plant .

  7. 通过对大坝基础灌浆成果资料、质量检查孔压水试验资料和水库蓄水1年多来监测资料的综合分析,洪家渡水电站大坝防渗体系的防渗效果显著,工程质量优良。

    Analyzed on the data of grouting , testing and observation after having impounded for more than one year , the construction quality of dam anti-seepage system is excellent .

  8. 阐述了贵州乌江洪家渡水电站厂房上部新型钢结构排架柱、吊车梁负荷试验时的变形、振动的观测方法与结果,并对结果进行了分析处理。

    This article introduces the methods and results of observing vibration and deformation of crane beams and framed columns-steel structures on the top of powerhouse when them were in load test , as well as analyzes the results .