乌江渡水电站

  • 网络Wujiangdu Hydropower Station
乌江渡水电站乌江渡水电站
  1. 乌江渡水电站扩机工程施工区地质条件复杂,岩溶发育,存在渗漏条件。

    The construction area of the extension project of Wujiangdu Hydropower Station has complex geologic conditions , developed karst with strong seepage conditions .

  2. 乌江渡水电站岩溶地区高压灌浆施工特殊情况的处理

    Disposal Method for Special Condition in High Pressure Grouting Engineering at Karst Area

  3. 应用乌江渡和二滩水电站泄洪雾化的原型观测数据,验证了挑流泄洪雾化的数学模型。

    Fore more the availability of OFAMM was verified based on the prototype observed data of atomization for Wujiangdu and Ertan Hydropower Station .