标准工时

  • 网络standard working hours;standard time;Cycle Time
标准工时标准工时
  1. 论文首先阐述了作业测定基本方法与基于秒表法的标准工时测定方法。

    First of all , the paper expatiate the basic methods of work measurement and standard time measurement methods based on the stopwatch .

  2. 自1995年5月1日起全国实行每周5天工作日和40小时标准工时制,1999年又推行了五一、十一、春节三个长假。

    Since May 1 , 1995 from throughout the country five days a week-days and 40 hours of standard working hours , following the implementation of the " May 1 ", " Oct 1 " in 1999 and " Spring Festival " three holiday .

  3. 以标准工时定额表中的计算公式为基础建立数学模型,应用神经网络来确定数学模型中的切削用量,构建一个与CAPP系统紧密结合的工时定额系统。

    The method establishes mathematical model based on the formulas of the standard man-hour ration table , applies neural networks model to calculate the cutting parameters of mathematical model , and constructs a man-hour ration system integrated with CAPP system .

  4. 建立了家具零件标准工时和辅助工时测定的体系;

    The mensuration system of furniture part 's human-hour is established .

  5. 新产品发布时完善标准工时5。参与产品测试活动。

    Develop MPP when new product launch.5.Be involved in testing .

  6. 标准工时测定和维护。

    Time study and update the work hour list .

  7. 操作工数量:列出标准工时所需操作工数量。

    OPER : List the number of operators that the standard hours listed represents .

  8. 执行标准工时制度。

    Perform the standard work hour system .

  9. 用时间研究的技术对所有零件的工序工时进行重新测量,制定了标准工时定额;

    According to the time studying , it reassures the time and process of all of the details .

  10. 基于标准工时的成套电器产品生产计划管理研究与应用及歌本的套装产品。

    The production plan management research and application based on standard labor time of whole set electric apparatus production ;

  11. 工艺开发、调试及不断改进,准备装配及测试指导书,开发并维护标准工时。

    Process development , debug , and continuous improvement ; prepare assembly and testing instructions and develop and maintain standard times .

  12. 人工费:用标准工时数乘上人工费率,或者用每小时生产率除以人工费率。

    LABOR COST : Multiply the LABOR RATE by the STD HRS or LABOR RATE divided by the hourly production rate .

  13. 按照操作规程及奔驰标准工时正确使用工具和装用设备。

    Perform work with the use of correct tools or special tools according to the guideline and MB standard flat rate time .

  14. 第一种情况是把每周标准工时从40小时缩减为30小时,而不改变小时工资率。

    The first is a reduction in the standard working week from forty hours to thirty without any change in the hourly rate of pay .

  15. 区间代数与区间段代数在定性时态推理中的联合运用决定标准工时最合理的方法,当推“时间及动作研究法”。

    Integral Usage of Interval Algebra and INDU Algebra in Qualitative Temporal Reasoning Standard for labor time is often established by using time and motion studies .

  16. 显而易见,劳务费用差异的产生是由于实际工时不等于标准工时,而实际工资率也不等于标准工资率所致。

    It is clear that labour cost variance arises due to the actual hours differing from the standard hours and the actual wage rate differing from the standard wage rate .

  17. 查标准工时定额表法是一种常用的、重要的工时定额计算方法,但在计算非标准结点时误差较大,难以制定较精确的工时定额。

    Searching standard man-hour quota table is a popular , important method to calculate man-hour quota , but when the method is used to calculate non-standard nodes in man-hour quota table , it has large errors and is hard to compute accurate man-hour quota .

  18. 同时,论文还使用作业测定方法,测定生产线作业时间并计算其标准工时和生产节拍,通过现有作业操作安排,发现生产线不平衡,员工利用率不足,有的利用率只有60%左右。

    The paper also uses work measurement method to measure operation time , calculate standard working time and production pacing . According to current operations arrangement , it identifies that production line is unbalancing , operators ' usage is low and some usage are only 60 % or so .

  19. 研究结果为企业采用科学的作业流程、方法和制定可靠的时间标准、工时定额提供辅助决策的技术平台。

    A technological platform is provided for enterprises to assist their decision making in applying scientific methods and formulating reasonable business flow and reliable time standards .

  20. 生产人力成本分析,包括测量作业工时,制定标准作业工时,并定期维护变更标准工时。

    Analyze the direct labor cost , including measure the work hours , stipulate the standard work hours , maintain and readjust the standard work hours .

  21. 以此为依据,研究了基于工艺标准化的工时定额制定技术以及工时定额验证技术。

    Subsequently , the technology of calculating Standard Time based on the standardized process and the rationality certification technology of the Standard Time is researched .

  22. 形成反差的是,三星未发现使用童工的证据,但表示大多数供应商违反了安全标准和法定工时上限。

    In contrast , Samsung found no evidence of underage workers but said that most suppliers breached safety standards and legal limits on working hours .

  23. 其中,直接成本计算相关的原材料的用量和标准单价、人工工时以及间接成本的资源动因均来源于BOM视图。

    Direct costs related factors , such as materials consumptions , standard price , artificial man-hour and indirect cost drivers are all derived from the BOM view .

  24. 分析通讯产品系统调试生产过程,提出采用概率论和标准合同的方法测算标准工时

    The production process of telecommunication product system test is analyzed , and it is put forward that adopting probability theory and " model contract " to measure standard labor time

  25. 林区剩余劳动力的鉴定标准有:边际劳动生产率标准、劳比例标准、有效工时不足标准、产业结构演变标准、比较利益标准等。

    There are several criteria for identifying surplus labor in forest region , including criteria for marginal labor productivity , labor scales , insufficient effective man-hour , transformation of industrial structure , comparative profits , etc.