广州抽水蓄能电站

  • 网络Guangzhou Pumped Storage Power Station
广州抽水蓄能电站广州抽水蓄能电站
  1. 广州抽水蓄能电站建设的科技进步成果

    Technological Advancements of Guangzhou Pumped Storage Power Station

  2. 广州抽水蓄能电站二期工程上游引水系统充排水试验

    Initial Filling and Emptying Tests on Headrace System of Guangzhou Pumped Storage Power Station Phase II

  3. 广州抽水蓄能电站机组经济调度及运用经验

    Economic Dispatching Strategies and its Operating Experience of Guangzhou Pumped-storage Power Plant

  4. 广州抽水蓄能电站场址区断层活动性研究

    Fault activity in the site area of Guangzhou water-pumping energy-storage power station

  5. 广州抽水蓄能电站改革建设管理体制取得建设工期短投资省的效益

    Reform of the construction management system of the Guangzhou pumped-storage hydropower station

  6. 广州抽水蓄能电站上库导流门设计特点

    Design Feature of the Upper Reservoir Diversion gate of Guangzhou Pumped-Storage Power Station

  7. 水压致裂应力测量在广州抽水蓄能电站设计中的应用研究

    Application of hydraulic fracturing test in the design of Guangzhou pump storage project

  8. 广州抽水蓄能电站设计洪水研究

    Study on Design Flood of Guangzhou Pumped Storage Station

  9. 水电建设管理改革的成功实践&广州抽水蓄能电站建设管理经验探讨

    The successful practice of the reform in the management system of hydropower construction

  10. 广州抽水蓄能电站厂区地应力测定及分析

    Ground Stresses Measurement and Analysis for the Underground Plant Area in Guangzhou Pumped-Storage Station

  11. 广州抽水蓄能电站地下厂房位移预报研究

    Displacement monitoring study of the underground plant of the pumping storage power station in Guangzhou

  12. 广州抽水蓄能电站一期工程动能设计初步回访

    Study Visit of Kinetic Energy Design or Guangzhou Pumped-storage Power Plant at its First Phrase

  13. 广州抽水蓄能电站水泵水轮机的最大入力和最大出力分别为326.08MW和347.70MW。

    The input and output of the pump-turbine unit in GPSP are 326.08 MW and 347.70 MW respectively .

  14. 广州抽水蓄能电站高压钢筋砼岔管现场模拟试验洞是一项大型的试验科研项目,它主要为广州抽水蓄能电站高压钢筋砼岔管服务。

    Field simulation pilot tunnel for high pressure reinforced concrete bifurcations is a large-sized scientific research item for Guangzhou Pumped Storage Station .

  15. 结合广州抽水蓄能电站上库导流门设计特点,重点介绍闸门及启闭设备的设计

    It also highlights the design of gate and hoisting equipment combining the design of the upper reservoir diversion gate of Guangzhou Pumped-Storage Power Station . The Door

  16. 广州抽水蓄能电站(下称广蓄电站)二期工程高压钢筋混凝土岔管采用平底岔管的型式,以利放空排水。

    To facilitate emptying the water , high pressure reinforced concrete bifurcations with flat bottom are used in the Stage ⅱ project of Guangzhou Pumped Storage Station .

  17. 应用广东推理公式法和单位线计算广州抽水蓄能电站水库坝址处设计洪水,并对两方法计算的结果进行分析比较。

    The rational formula method and the unit hydrograph method are used and compared in the calculation of the design flood for the Guangzhou pumped storage station in this paper .

  18. 本文依据广州抽水蓄能电站地下厂房区4个钻孔不同深度的地应力实测资料,介绍了4个二维和1个三维地应力场的分析成果。

    Based on the measured data of ground stresses along different depths of 4 boreholes in the Guangzhou underground plant , this paper presents the analysis results of four 2-D and one 3-D ground stress fields .

  19. 广州抽水蓄能电站二期地下厂房开挖爆破施工对一期厂房已运行机组震动影响的实测与安全控制研究

    The Study on the Critical Safety of Operating Generators in Established Underground Power Station Which Are Affected by Vibration Resulting from the Explosion of Succeeding Openings by Site Measurement of a Pumping Hydropower Station in Guangzhou

  20. 本文介绍广州抽水蓄能电站一期工程高压隧洞、高压岔管及高压引水钢支管的排水系统布置及其充水试验后的效果。

    This paper presents the arrangement of drainage system for high pressure tunnels , high pressure bifurcations and high pressure diversion penstocks of stage I Project of Guangzhou Pumped Storage Station and the results after filling test .

  21. 广州抽水蓄能电站在圆满完成一期工程后,从实际出发,对一期工程建立的管理模式、管理方法进行改进,勇于探索使之更完善和发展。

    After the first stage work of Guangzhou Pumped Storage Power Station was successfully completed , the management mode and method established for the first stage work were investigated and improved to make them more perfect and advanced .

  22. 用实现的系统对广州抽水蓄能电站工程进行围岩稳定性分析评价,结果证明人工神经网络方法用于工程地质数据分析有着其他方法不可比拟的优越性。

    By using the realized system , the paper makes an evalution on the engineering of GuangZhou Pumped - storage power station and the result suggests that the artificial neural network method has great advantage in the data analysis of geological engineering comparing other methods .

  23. 提出基于支持向量机的岩体分类算法,建立了基于支持向量机的岩体分类模型,并成功地实现了此模型在广州抽水蓄能电站二期工程围岩分类及岩石三性综合分级中的应用。

    The fourth work put forward rock mass classification algorithm based on SVM and constructed the rock mass classification model based on SVM , then succeeded applying this model to the second project surrounding rock classification of GuangZhou pump accumulator electricity station and synthesis three-character rock classification .

  24. 结合广州、惠州抽水蓄能电站对抽水蓄能电站通风空调设计中存在的问题进行了探讨。

    The issues in design of ventilation and air conditioning for pumped storage power station are discussed in connection with the Guangzhou and Huizhou pumped storage power stations .