工程总投资

工程总投资工程总投资
  1. 每增加1000万m3用水量,工程总投资就减少0.51亿元左右,新增工程年费用减少463.55万元。

    When the water increases 1000 million m3 , the investment of total project will decreases 0.51 billion yuan , and the adding annual cost of project will decrease 463.55 million yuan .

  2. 一期工程总投资12309万元,年制水量1825万m3,平均单位制水成本0.596元/m3。

    The total investment of the first period of project is 123.09 million , manufacturing capacity is 18.25 million m3 / year , the average unit cost of water production is 0.596 yuan / m3 .

  3. 改造工程总投资1534万元,盘活了2个5000m3的贮水罐(资产1200万元)和原斜板隔油池的占地500m2。

    The overall investment of the innovation project is 1 534 million RMB . Two 5 000 m 3 water storage tanks ( cost 12 million RMB ) and 500 m 2 land space occupied by the former oil-water separators are saved for reuse .

  4. 工程总投资41.4亿元。

    The total investment of the engineering is 41.4 hundred million yuan .

  5. 三千零一十元工程总投资15.43万元。

    Total investment is 154.3 thousand RMB yuan .

  6. 三峡工程总投资额分析

    Investment quota system Analysis for Three Gorges project

  7. 工程总投资中的其它费用

    Other Expenditure in Project Budget

  8. 莲子受力有限元分析工程总投资15.43万元。

    Analysis of Finite Element Method for Loaded Lotus Seed total investment is 154.3 thousand RMB yuan .

  9. 废水处理工程总投资100万元,运行成本为10.6元/吨。

    The total engineering invest was one million RMB and the operational cost was 10.6 RMB / t.

  10. 以粮食换生态,到2010年工程总投资将逾1000亿元

    More than 100 billion yuan will be invested in the project to " trade grain for ecology " by 2010

  11. 工程总投资估算值13880万元,项目的内部收益率所得税前为13.82%,高于基准收益率12%。

    The inner yield before income tax is 13.82 % , which is higher the basic requirement of yield 12 % .

  12. 工程总投资4500万元,运行费为0.4~0.6元/m~3污水。

    The total investment of this plant is 45 million RMB and the operating fee costs 0 . 4-0 . 6 RMB per cubic meter of treated wastewater .

  13. 创新水利建设制度管理,主要围绕造价的静态控制、动态管理,达到控制工程总投资规模的目标。

    Innovating management system of water project construction should center on static and dynamic control of cost in order to reach the target of controlling total investment of project .

  14. 城市轨道交通运用车的配属数量直接决定了轨道交通线路的“输送能力、服务水平”,并对工程总投资有很大影响。

    The allocated number of serviceable car has direct impact on the carrying capacity and service level of an urban rail transit line , and has significant influence on the total investment .

  15. 在可行性研究阶段的投资估算要具体些,要深入到每个具体项目的投资,同时要做整个项目的经济评价,通过投资估算出的工程总投资,在经济效益上看这个工程项目是否可行。

    Whether the engineering is feasible on economic benefits can be decided by gross investment resulting from the investment estimates of feasibility study phase . General estimate need be made in conceptual phase .

  16. 技术改造工程总投资990.44万元,年运行费用为336.34万元,年增加经济效益200.78万元,取得了良好的社会效益、环境效益、经济效益。

    The total investment in technological transformation of 9.9044 million yuan , the annual operating cost of 3.3634 million yuan , an increase of 2.0078 million yuan economic benefit . It achieved good social benefits , environmental benefits and economic benefits .

  17. 介绍了该工艺流程、各工序设备改造内容、操作指标和改造工程总投资,指出其操作要点,并提出存在问题和完善对策。

    This article introduces the process , the revamped equipment of each section , operation indexes and the total investment of the revamp project and points out the key points of the operation , the existing problems and ways of improvement .

  18. 在经济上,工程总投资随材料价格、施工水平、设计方案的各项指标的变化而变化;在可靠性方面,又受控于设计方案的各项技术指标。

    In view of economy , the total project investment varies with the changes of all such indicators as material price , construction level and engineering plans . The reliability is always under the control of all technical indexes of the engineering plans .

  19. 三峡工程总投资包括枢纽建筑物总费用、建设征地和移民安置费用、独立费用、基本预备费、价差预备费和建设期贷款利息等六大部分。

    The total investment in the construction of the project includes gross expenditures for the main works , expenditures for resettlement and land acquisition for construction , independent fees , basic reserve funds , reserve funds for price differences , and interest for loans during construction .

  20. 而在盾构隧道施工中管片的投资一般占工程总投资的30~40%,是影响施工经济性和结构安全性的重要因素,因此安全、经济、合理地进行盾构隧道衬砌设计具有重大的意义。

    The investment of segment generally accounting for 30-40 % of the total project investment in shield tunnelling construction , is an important factor that influences the construction economic and the structure security , so it is of great significance to design the shield lining safely , economically and reasonably .

  21. 1994年以来,中央政府直接投资建设了62项工程,总投资达48.6亿元;

    Since 1994 , the Central Government has directly invested a total of 4.86 billion yuan in 62 projects ;

  22. 在灌溉输配水管网的设计中,不同的灌溉工作制度会在管网中产生不同的流量分配模式,直接影响管网工程总的投资。

    Different working scheme has different design flow in delivery and distribution pipe for irrigation that will influence the project investment .

  23. “十五”期间,天然林保护工程国家总投资占林业六大工程国家总投资的44.17%,在林业生态建设中发挥重要作用。

    During the period of " the Tenth Five-Year Plan " in China , as one of " Six Key Forestry Project ", natural forests protection project ( NFPP ) has accounted for44.17 % of the total investment six projects .

  24. 在工程项目总投资中设备费用所占的比重较大,项目设备采购的好坏决定工程项目建成后能否顺利试运行并达到连续、稳定和安全运行的要求。

    The cost of equipments takes a large proportion in the whole engineering project investment expenses . Project equipments purchasing decides whether the project can be successfully commissioning and achieve continuous , stable and safe operation requirements or not after the project is completed .

  25. 第二部分(第5章)为济南同济环境工程总公司对外投资项目的财务分析与评价。

    Part 2 ( chapter 5 ) exemplifies the financial analysis and evaluation to the oversea investment of Jinan Tongji Environment Engineering Company .

  26. 工程造价、项目总投资、流动资金有关概念辨析

    Discrimination on Engineering Cost , Project Investment and Working Capital

  27. 该工程建设项目估算总投资为:3850万元,拟定建设期1年,运营期19年。

    The construction project is estimated to total investment : 38.5 million yuan , construction drawing period of 1 year , operators of 19 years .

  28. 在供水工程中管网部分的投资一般要占到工程总投资的50%~80%,而且影响管道系统的能耗和运行管理费用。

    In the whole pipe irrigation network system , the pipe network investment usually contains 50-80 % of the total investment . Moreover , water delivery system affects the energy consumption and operational management costs of the pipeline system .

  29. 国际工程投标商(承包商)资质的编制工程造价、项目总投资、流动资金有关概念辨析

    Qualified Requirements for International Engineering Bidders ( Contractors ); Discrimination on Engineering Cost , Project Investment and Working Capital

  30. 城市给水管网工程是城市供水工程的重要组成部分,管网造价也是影响整个供水工程项目总投资的重要因素。

    Urban water distribution network design is a relatively important component of the entire design of urban water supply project .