首页 / 词典 / good

puqi

  • 网络蒲圻
puqipuqi
  1. Neutral Grounding Selection of HV Auxiliary Power System in Puqi Power Plant

    蒲圻电厂高压厂用电系统中性点接地方式的选择

  2. The planned capacity of Puqi Power Plant is 1 200 MW . Because of the high capacitor current of the auxiliary transformer , the high-voltage auxiliary power system must be grounded .

    蒲圻电厂规划容量1200MW,在选择高压厂用电系统接地方式时,计算容量最大的厂用变所连接供电网络的单相接地电容电流,电流偏高,不能采取不接地方式。

  3. A Two Head Snake With a Blunt Tail Discovered at Lushui Puqi Conuty

    蒲圻陆水发现钝尾两头蛇

  4. The analysis of riverway flooding renovation engineering and beach area erosion Study on the cause of cracking and strengthening technology for sluice pier cracks in flooding monolith of Lushui Puqi hinge

    河道整治工程溢流及滩区冲刷分析陆水蒲圻水利枢纽溢流坝段闸墩加固措施研究