鲁布革水电站

  • 网络lubuge hydropower station
鲁布革水电站鲁布革水电站
  1. 鲁布革水电站右岸泄洪洞承担着鲁布革大坝泄洪、排沙、放空水库的任务,是最重要的泄洪、排沙通道。

    The right bank spillway tunnel at Lubuge hydropower station is the most important passageway of water discharging and sediment flushing .

  2. 本文以鲁布革水电站溢洪道岩质边坡为例,叙述了有关边坡稳定分析的概率统计方法。

    In this paper the probabilistic and statistical analysis of stability of rock slope with the example of Lubuge hydroelectric power station is described .