脱硫塔

  • 网络desulfurizer;desulfurization tower;desulfurizing tower;thionizer;de-sulfur tower
脱硫塔脱硫塔
  1. 10年内曾两次更换溶剂脱硫塔。

    Solvent desulfurization tower had to be replaced two times within 10 years .

  2. 脱硫塔气固两相流场优化的数值模拟研究

    Numerical Simulation Study on the Optimization of Gas-solid Two-phase Flows in a Desulfurization Tower

  3. 半水煤气脱硫塔出口气H2S含量超标原因分析及处理措施探讨

    Analysis of Causes and Dealing Measures Discussion of High H_2S Content Purified Gas of Desulphurizing Tower

  4. 同时,针对LPG脱硫塔操作时塔顶易带胺的特点,分析了夹带胺液的原因,从工艺和设备上给出了解决问题的办法。

    The root causes of amine entrainment are analyzed and solutions are proposed in respect of the process and equipment .

  5. 316L不锈钢脱硫塔的焊接制造

    316L stainless steel desulfurization column jointing produce

  6. 液化石油气(LPG)脱硫塔是保证LPG质量的重要设备。

    Amine extraction tower for liquified petroleum gas ( LPG ) desulfurization is the critical equipment to ensure the LPG quality in operation .

  7. 采用二级无喷头脱硫塔和含Mn2+/Fe2+催化剂的石灰水溶液吸收高浓度SO2技术对镍铜冶炼废气进行处理。

    Building two desulfuration towers without spouts in which the water solution containing Mn2 + or Fe2 + is prepared to absorb the dense SO2 in melting copper and nickel .

  8. 以220t/hCFB锅炉为例,设计了烟气循环流化床脱硫塔的工业装置,并建立其数值模拟平台。

    In this paper , a desulfurization tower plant of flue gas circulating fluidized bed desulfurization was designed for220t / h CFB boiler , and its numerical simulation platform was established .

  9. 以旋流板塔为脱硫塔,实验研究了Na2CO3-Ca(OH)2双碱法脱硫工艺。旋流板塔内两相流场的CFD模拟与分析

    The Na2CO3-Ca ( OH ) 2 dual-alkali FGD process in a Rotating-Stream-Tray Scrubber was studied experimentally . Simulation and Analysis on the Two-Phase Flow Field in Rotating-Stream-Tray Absorber by Using CFD Method

  10. 脱硫塔501-EA的焊接修复

    Repair of Weld Flaw in the Desulfurizer 501-EA

  11. 脱硫塔填料高度的计算方法

    The method for calculating the packing height of sulfur removal tower

  12. 锅炉与脱硫塔的组合方式;

    The combination mode of the boiler with the absorption tower ;

  13. 脱硫塔双程旋流板结构及其设计方法探讨

    Structure of Double Passing Cyclone in Desulfurizer and Discussion on Its Design

  14. 煤气湿法脱硫塔堵塞问题的讨论

    Discussion on the Blocking Problems of Wet Gas H_2S Scrubber

  15. 烟气分布器对半干法脱硫塔流场的影响

    Influence of flue gas distributor on flow field of semi-dry desulphurization reactor

  16. 湿式脱硫塔除雾器流场的数值模拟

    Numerical simulation of flow field for mist eliminator in wet desulphurization tower

  17. 新型规整填料在脱硫塔中的应用研究

    Study on Application of Structure Packing to Desulfurizing Columns

  18. 液柱脱硫塔压力特性研究

    Pressure characteristics of liquid-column tower for flue gas desulfurization

  19. 火电厂烟气脱硫塔气体分布装置设计

    Design for gas distribution device of flue gas desulfurization tower in thermal power plants

  20. 关键部位对脱硫塔结构的动力影响分析

    Study on the influence of key components on structural dynamic properties of desulfuration towers

  21. 研究结果为脱硫塔体内部结构的优化提供了依据。

    The study results supplied the basis of optimization of the structure of desulphurization reactor .

  22. 湿式脱硫塔除雾器冲洗喷嘴冲洗流量研究

    Study on the Flushing Flux for Flushing Nozzles of a Demister in Wet Desulphurization Tower

  23. 湿式烟气脱硫塔中折线型挡板除雾器分离效率的数值模拟

    Numerical Simulation of Separation Efficiency of Demisters with Serrated Baffles in Wet Flue Gas Desulfurization Towers

  24. 反应容器按脱硫塔尺寸等比例缩小。

    Size of reaction vessel is decided according to reduced size of thionizer in equal proportion .

  25. 本文结果将有助于改进喷雾脱硫塔的设计和操作。

    These results will help to optimize the design and operation of the spray drying scrubber .

  26. 本文介绍填料脱硫塔填料高度的计算方法。

    This Paper introduces the method for calculating the packing height of Packed tower for sulfur removal .

  27. 填料&旋流板复合新型脱硫塔在加压变脱中的应用

    Application of New Complex Tower with Packing and Spiral Flow Plate to Sulfur Removal at Pressurized Shift Section

  28. 循环流化床脱硫塔直/旋流复合流化下的两相流场试验研究

    Experimental Study of Two-phase Flows under the Composite Fluidization of Desulfurizer Straight / rotating Flows in a Circulating Fluidized Bed

  29. 针对催化剂装填更换中存在的问题,介绍对脱硫塔的改造情况,以及日常操作、检修中的一些预防措施。

    For the catalyst replacement problems , introduce the desulfurizer modification , and some preventive measures in operation and maintenance .

  30. 这个规律的存在直接影响该类喷嘴本体设计和脱硫塔雾化系统设计。

    This rule directly affects the design of this kind of swirl nozzle and the atomization system in a desulfurization tower .