长洲水利枢纽

  • 网络changzhou hydraulic complex
长洲水利枢纽长洲水利枢纽
  1. 长洲水利枢纽工程AGC功能设计及实现方法

    Function Design and Implementation of AGC at Changzhou Hydraulic Complex

  2. 面向有封闭内腔和外形的复杂工件快速原型制造的ICT图像处理及反求工程研究长洲水利枢纽电站1号发变组封闭母线伸缩节过热原因分析及处理

    Study on RPM Based on Industrial Computed Tomographic Images of the Part with Complicated Interior and Exterior Shape ; Cause Analysis and Treatment of Overheated Enclosed Bus Expansion Joint of 1 # Generator-Transformer Unit at Power Station of Changzhou Hydraulic Complex

  3. 南瑞RCS-985S选择性定子接地保护在长洲水利枢纽工程扩大单元接线的应用

    Application of NARI RCS-985S Selective Stator Grounding Protection to Expanded Unit Connection at Changzhou Hydraulic Complex

  4. 长洲水利枢纽建坝后水流流态变化的可能性分析

    The possibility analysis of flow pattern change after construction Changzhou hydroproject

  5. 长洲水利枢纽工程建设项目档案管理研究与探索

    Study on File Management for Construction Project of Changzhou Hydraulic Complex

  6. 长洲水利枢纽整体水工模型相似性分析

    Similarity Analysis of Integral Hydraulic Model for Changzhou Hydraulic Complex

  7. 长洲水利枢纽机组出流量计算曲线修正研究

    Study on Amendment of Unit Discharge Calculated Curve of Changzhou Hydraulic Complex

  8. 长洲水利枢纽工程机型及其参数优化选择

    Optimal selection of turbine type and parameters for Changzhou water control project

  9. 长洲水利枢纽主体工程护坡设计施工探究

    Design and Construction of Revetment for Main Works of Changzhou Hydraulic Complex

  10. 长洲水利枢纽计算机监控系统设计及功能特点

    Design and Functional Characteristics of Computer Monitoring System at Changzhou Hydraulic Complex

  11. 长洲水利枢纽库区移民安置规划设计

    Reservoir area inhabitant resettlement planning design for Changzhou hydraulic complex

  12. 长洲水利枢纽电站发电机进相运行分析

    Analysis on Phase-lead Operation of Generator at Power Station of Changzhou Hydraulic Complex

  13. 浅析长洲水利枢纽工程对环境的影响及环保措施

    Environmental influence and protection measures of Changzhou hydraulic complex

  14. 百色、长洲水利枢纽前期工作情况

    Circumstances of earlier stage work of Baise and Changzhou water resources pivotal projects

  15. 长洲水利枢纽施工进度优化的研究

    Study on Optimization Construction Schedule of Changzhou Reservoir Project

  16. 长洲水利枢纽电站初期经济运行与优化调度

    Initial Economic Operation and Optimal Scheduling of Power Station at Changzhou Hydraulic Complex

  17. 长洲水利枢纽坝址洪水设计

    Dam site flood design for Changzhou hydraulic complex

  18. 关于长洲水利枢纽工程考察学习的思考

    Thought of the inspection of Changzhou Hydro-junction Project

  19. 长洲水利枢纽外江厂房混凝土外观质量控制

    Quality Control over Concrete Appearance for Power House on Outer River of Changzhou Hydraulic Complex

  20. 长洲水利枢纽外江工程混凝土施工温控措施总结

    Temperature Control Measures for Concrete Engineering of Works on Outer River of Changzhou Hydraulic Complex

  21. 长洲水利枢纽三线四线船闸建设征地移民安置初步规划

    Preliminary Planning of Land Acquisition and Resettlement for NO.3 and No.4 Line Navigation Locks'Construction at Changzhou Hydro-junctions

  22. 论述长洲水利枢纽一期工程的导流标准、导流方案、导流建筑物布置和设计等。

    The paper disserts the diversion standard , the diversion scheme , the layout and design of diversion structures etc.

  23. 长洲水利枢纽内江厂房坝顶门机的控制系统应用

    Application of Control System to Portal Crane on Dam Crest of Power House on Inner River of Changzhou Hydraulic Complex

  24. 长洲水利枢纽电站外江厂用电特殊情况下的运行方式分析

    Analysis on Operation Mode of Station Service System on Outer River of Power Station of Changzhou Hydraulic Complex under Special Conditions

  25. 乌江银盘水利枢纽省水船闸运行方式研究滑模施工在长洲水利枢纽中江泄水闸门槽二期混凝土施工中的应用

    Application of Slip Form Engineering Technique to 2nd Phase Concrete Engineering of Sluice Gate Slot at Mid River of Changzhou Hydraulic Complex

  26. 文章介绍了长洲水利枢纽三线四线船闸工程农村移民安置规划设计情况。

    The article introduces the situations of rural land acquisition and resettlement for No.3 and No.4 Line navigation locks'construction at Changzhou hydro-junctions .

  27. 长洲水利枢纽工程外江、内江厂房共装设15台大型灯泡贯流式水轮发电机组,单机容量42MW。

    There are15 large bulb tubular turbine-generator units with a unit capacity of42MW in inner and outer river plants of Changzhou Hydraulic Complex .

  28. 长洲水利枢纽内江、中江工程地基处理施工长江三峡水利枢纽底孔和深孔水力学研究

    Foundation Treatment for Works on Inner and Mid Rivers of Changzhou Hydraulic Complex Hydraulic Model Tests on Bottom and Middle Outlets for Three Gorges Project

  29. 梯级水电站群径流随机模拟及中长期优化调度长洲水利枢纽电站初期经济运行与优化调度

    Runoff Stochastic Generation and Mid-long Term Optimized Operation of Cascaded Hydroelectric Plant ; Initial Economic Operation and Optimal Scheduling of Power Station at Changzhou Hydraulic Complex

  30. 本文在这里用网络计划技术作理论工具对长洲水利枢纽的施工进度进行了调整和优化。

    In this research report , with use of network planning technique as a theory tool , adjustment and optimization are made to the programme of Changzhou Project .