郑东新区

  • 网络Zhengdong New District
郑东新区郑东新区
  1. 经郑州市郑东新区城市水域面积实证分析,取得了实用性成果与结论。

    Through an empirical analysis made on the water area in Zhengdong New District in Zhengzhou City , practicable result and conclusion are obtained .

  2. RTK技术在郑东新区测图中的应用

    Application of the RTK Technology in Topographic Survey in Zhengzhou CBD

  3. 在深入实地考察的基础上,对造成郑东新区CFG桩施工主要问题的原因进行了探讨,得出触变、抽吸、振动剪切液化、渗流作用是引起施工问题的主要原因。

    The causes for the problems are discussed through the field investigation . The thixotropy , pumping , dynamic shear liquefaction and seepage are the main reasons .

  4. 郑东新区某高层建筑地基勘察与设计

    Geotechnical Survey and Design for Foundation for A Tall Building in New District of Zhengzhou

  5. 这张照片是在郑东新区的龙湖岸边。

    This pic was in the bank of Dragon Lake in east area of Zhengzhou .

  6. 郑东新区地下管道顶管施工中常遇到的几个问题

    Frequent Encounter Problems in Underground Pipeline Thrusting

  7. 新型玻璃钢锚杆及其在煤帮支护中的应用研究郑东新区土钉墙加微型钢管桩基坑支护技术

    A novel glass fiber bolt and its application in coal rib support Application of Micro-steel Pipe Pile in Deep Foundation Excavation Retaining and Protection

  8. 学校周边紧邻着已经开盘的代表郑东新区高尚住宅的绿城小区、上海老街等。

    School peripheral next-door neighbor already representative east newly developed area noble " green city district ", " old street of Shanghai " house , etc.

  9. 通过实测结果和理论计算结果的对比分析,总结了适合郑州市郑东新区以粉质粘土、粉土为主,地下水位较浅的典型地质背景下的管桩复合地基沉降变形的一般规律。

    Some general features of pipe pile composite foundation settlement derived from the typical geology background of silty clay , silty soil and shallow water level in Zhengzhou are summarized .

  10. 从交通供给的角度寻求解决城市路网供需矛盾问题。首先建立基于成本效益均衡的道路网络扩张模型,然后设计该模型的求解算法,最后给出了郑东新区路网容量扩张方案的应用实例。

    From the angle of traffic supply , the paper tries to find the way to solve the contradictions between supply and demand in urban road network s , sets up the road network expansion model based on cost-benefit equilibrium and gives out the solution for the model .