白沙河

白沙河白沙河
  1. 白沙河平原区地下水资源现状供需平衡分析

    Water supply-demand balance analysis of present conditions in Baisha alluvial plain

  2. 白沙河流域地下水及营养盐向海湾输送

    Estimation of Groundwater and Nutrients Flux from Baisha Watershed into Jiaozhou Bay

  3. 白沙河地下水资源管理模型

    Groundwater resources management model of Baisha alluvial aquifer

  4. 白沙河平原区需水预测

    Water demand forecast in Baisha alluvial plain

  5. 长沙白沙河公路桥工程地质条件及勘察要点

    Engineering Geological Condition of Baisha River Highway Bridge in Changsha and Main Points on Its Exploration

  6. 研究森林变化对河川水沙影响的一种便捷方法&以四川省都江堰市白沙河为例

    A Forthright Way of Research on Effect of Forests Change on Flow and Sediment of River

  7. 汶川大地震都江堰市白沙河堰塞湖工程地质力学分析

    Engineering Geo-mechanics Analysis of the Barrier Lake in Baisha River at Dujiangyan City Induced by Wenchuan Earthquake

  8. 因青岛重庆路加宽改造和下游增设新的斜交桥,导致此处白沙河河道过水面积减小,桥前壅水叠加。

    Because Qingdao Chongqing road widening and downstream adding new skew bridge , result in Baisha River area decreases , bridge front backwater superposition .

  9. 代表团一行先后实地参观了白沙河厂区及集团总部能源管理平台,并就厂区规划、节能降耗、班组建设等工作进行了交流。

    The delegation has toured the plant and corporate headquarters in White River energy management platform , and on factory planning , saving energy , team-building and other work for the exchange .

  10. 根据白沙河流域自然地理和水文地质特征,在大量室内外试验的基础上分别运用水量均衡法、断面法和咸淡水界面法,估算了白沙河流域地下水向海湾的输送水量及营养盐输送量。

    The groundwater and nutrients discharge from the Baisha Watershed is estimated by the water quantity equilibrium method , the section method and the salt-fresh water interface method based on the physiogeographic and hydrogeologic conditions and a great many outdoor and indoor experiments .